Contractor · Demolition & excavation
Steve Caruso
14 building permits since 2018 in Rochester city, NH.
- Building permits
- 14
- Reported job value
- —
- Active
- 2018–2024
- Latest permit
- Jul 30, 2024
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Rochester city, NH14
Permits by year
By issue date (application date where there is none).
036
6
20182021202220232024
View as tableHide table
| Year | Permits |
|---|---|
| 2018 | 2 |
| 2021 | 6 |
| 2022 | 2 |
| 2023 | 2 |
| 2024 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Grading & excavation13
- Electrical11
- HVAC1
- Electric meters1
Permit types
As the building departments classify them.
- Excavation Permit10
- Obstruction Permit4
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 30, 2024 | Excavation Permit | Install 5" Electric conduit from 90 South Main Street, across the street to 95 South Main Street in the parking lot area, and to poles in front of houses 7 and | Rochester City | — |
| Jan 24, 2024 | Excavation Permit | Work continued for permit RO-23-29. Finish connecting conduit into MH on North Main Street, restoration of crosswalks in spring/summer, and terminate into MH @ | Rochester City | — |
| Sep 11, 2023 | Excavation Permit | Install 6-5" conduits 430' +/- from existing MH on N Main Street to a newly installed MH at Wyandotte Falls. This work is for Eversource Electric | Rochester City | — |
| Mar 14, 2023 | Excavation Permit | Cut and cap 5" electric risers on poles 4/20, 50/4, 50/3, 5/Y, 5/1, 4/15. This is all part of the Strafford Square project. At pole 5/Y and 50/3, relocating 3" | Rochester City | — |
| Dec 12, 2022 | Excavation Permit | Install HH in sidewalk infront of House 8A and run conduit to meter socket. Cross road to pole across the street to pole infront of House 7. Crew will also be w | Rochester City | — |
| Dec 7, 2022 | Obstruction Permit | In conjuction to excavation permit submitted at same location. The obstruction will be our equipment in area when we are excavating. This is for Eversource Elec | Rochester City | — |
| Jul 8, 2021 | Excavation Permit | Locate existing electric duct bank. Install new MH in roadway and tie existing electric ducts into MH. This work is for Eversource Electric. | Rochester City | — |
| Jul 8, 2021 | Excavation Permit | Intstall Manhole and Transformer pad in parking lot area and mulch area. Tie in existing conduits into new manhole and existing manhole. This project is for Eve | Rochester City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed12
- Active2
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.