Contractor · Specialty (solar, fire, telecom)
SOLAR TECH
14 building permits since 2022 in Sebring city, FL; Highlands County, FL and Avon Park city, FL.
- Building permits
- 14
- Reported job value
- —
- Active
- 2022–2026
- Latest permit
- Jan 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sebring city, FL6
- Highlands County, FL5
- Avon Park city, FL2
- Lake Placid town, FL1
Permits by year
By issue date (application date where there is none).
01.53
3
20222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2022 | 3 |
| 2023 | 2 |
| 2024 | 2 |
| 2025 | 3 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar11
- Electrical3
Permit types
As the building departments classify them.
- SOLAR7
- Res - Solar4
- Res - Electric2
- ELECTRICAL - NEW SERVICE1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jan 28, 2026 | SOLAR | INSTALL PHOTOVOLTAIC SOLAR SYSTEM NEC2020 | Avon Park City | — |
| Jan 28, 2026 | SOLAR | INSTALL PHOTOVOLTAIC SOLAR SYSTEM NEC2020 | Highlands County | — |
| Jan 5, 2026 | ELECTRICAL - NEW SERVICE | INSTALL [1] PHASE, 200 AMP, 240 V SERVICE NEC 2020 | Highlands County | — |
| Sep 25, 2025 | Res - Solar | PHOTOVOLTAIC SYSTEM. 839.94 TOTAL SQ FT OF PANELS. | Sebring City | — |
| May 29, 2025 | Res - Electric | REPLACE EXISTING 20A CIRCUIT TO SHED. ADD ONE 20A CIRCUIT TO SHED WITH 2 NEW OUTLETS. | Sebring City | — |
| Apr 15, 2025 | Res - Electric | ADD 2 NEW 20A CIRCUITS. ADD 1 INDOOR OUTLET, 1 OUTDOOR OUTLET, 1 SWITCH, AND 2 LED LIGHTS IN DETACHED GARAGE. | Sebring City | — |
| Oct 24, 2024 | Res - Solar | PHOTOVOLTAIC SYSTEM. 602 TOTAL SQ FT OF PANELS. | Sebring City | — |
| Feb 5, 2024 | SOLAR | INSTALL PHOTOVOLTAIC SOLAR SYSTEM 1,288 SQFT PANELS NEC2020 | Highlands County | — |
Permit status
Where its permits stand, as the departments report them.
- Closed8
- Finaled5
- Cancelled1
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.