Contractor · Electrical

Frank Pascal Jr.

207 building permits since 2012 in Orleans Parish, LA and East Baton Rouge Parish, LA, across 2 counties.

Building permits
207
Reported job value
—
Active
2012–2026
Latest permit
Sep 24, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA206
  • East Baton Rouge Parish, LA1

Permits by year

By issue date (application date where there is none).

02040
40
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20123
201314
201440
201519
201613
201713
20185
20197
202013
202116
202222
202311
20245
202515
2026 (YTD)11

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical92
  • Remodels50
  • Electric meters24
  • Kitchens7
  • Bathrooms7
  • Generators6
  • HVAC3
  • Pools & hot tubs3
  • Additions2
  • New construction2

Permit types

As the building departments classify them.

  • Electrical Permit (C)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 24, 2026—*Urgent* Pelican Electric is requesting a vacancy permit so that we can have the property inspected and Entergy can hook up power. The property has been withoutOrleans Parish—
Sep 4, 2026—*URGENT* Pelican Electric is seeking a permit to run a new 60amp feed and disconnect for the condo's elevator. Pelican will install new grounding. This permit iOrleans Parish—
Aug 10, 2026—*URGENT* Pelican Electric is requesting a permit to replace the feeder stem to the meter panels. The feeder stem was ripped off of the wall due to an 18-wheelerOrleans Parish—
Jun 4, 2026—Pelican Electrical a permit that we feel is urgent. Client has been experiencing power interruptions, Entergy has been on site and confirmed it is not in their Orleans Parish—
May 6, 2026—Pelican Electric is requesting a permit to install a new 200A 3-phase meter enclosure and a new 200A 3 phase outdoor main breaker panel with 42 spaces. Pelican Orleans Parish—
May 6, 2026—Pelican Electrical is requesting a permit to install exit signs and exterior lighting to the property. Pelican will do all work per current code. Thank you.Orleans Parish—
Mar 17, 2026—Pelican will remove 100 amp service and install a new 200 amp service in same location. Project will include a new 200 amp meter enclosure, new 200 amp main breOrleans Parish—
Mar 1, 2026—Pelican Electrical has an open permit # 25-39296-SERV for this site. However, since property used to be 2 homes and is now under renovation to become 1 homeowneOrleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued120
  • Not stated30
  • Finaled28
  • C/o issued19
  • Expired4
  • Void3
  • Closed2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.