Contractor · Electrical
Shawn DiSpirito
14 building permits since 2020 in Middletown town, RI; Newport city, RI and North Smithfield town, RI, across 3 counties — $103,300 in reported job value over 13 permits that state one.
- Building permits
- 14
- Reported job value
- $103.3K
- Active
- 2020–2026
- Latest permit
- May 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Middletown town, RI4
- Newport city, RI4
- North Smithfield town, RI3
- Attleboro city, MA1
- Tiverton town, RI1
- Cranston city, RI1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2022 | 9 |
| 2023 | 2 |
| 2024 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical14
- Bathrooms4
- Kitchens2
- Electric meters2
- HVAC1
- Generators1
- Windows & doors1
Permit types
As the building departments classify them.
- Electrical Permit12
- 2) Electrical Permit1
- ELECT.1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 27, 2026 | Electrical Permit | 200 amp underground service to building with new meter. General circuts for garage lighting, compressor, 2 furnaces, 2 air handlers, 2 ac condensors, 3 lifts, 3 | North Smithfield Town | $20,000 |
| Jan 15, 2024 | 2) Electrical Permit | Installing new outlets for downstairs bathroom. Bathroom fan and laundry room circuit | Cranston City | $400 |
| Mar 8, 2023 | Electrical Permit | Meter main, overhead service conductors, and taps | Tiverton Town | $2,000 |
| Mar 1, 2023 | Electrical Permit | Rewire outlets and lights | Middletown Town | $35,000 |
| Dec 14, 2022 | Electrical Permit | Rewire master bedroom and half bath. Rewire kitchen. | Newport City | $15,000 |
| Dec 7, 2022 | Electrical Permit | BASEMENT: Installing 20 outlets, 20 lights, 4 smoke detectors, a 60 amp sub panel and installing 1 fan, 2 lights and 1 outlet in a bathroom. (B-22-983) | Newport City | $2,000 |
| Dec 5, 2022 | Electrical Permit | Remove and replace 60 amp subpanel with exisiting feed | Middletown Town | $1,800 |
| Nov 21, 2022 | Electrical Permit | Install new 200 amp metermain and new 200 amp distribution panel adding 2 pole 30 amp backfeed generator with interlock system | North Smithfield Town | $6,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed8
- Active3
- Stop work ordered2
- Finaled1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.