Contractor · HVAC

paiva heating & a/c

14 building permits since 2021 in Falmouth town, MA; Randolph Town city, MA and Taunton city, MA, across 3 counties — $142,700 in reported job value over 7 permits that state one.

Building permits
14
Reported job value
$142.7K
Active
2021–2026
Latest permit
Apr 13, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA7
  • Randolph Town city, MA6
  • Taunton city, MA1

Permits by year

By issue date (application date where there is none).

024
4
202120222023202420252026*
* 2026 is year to date.
View as table
YearPermits
20211
20222
20231
20242
20254
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC13
  • Gas9
  • Bathrooms3
  • Heat pumps3
  • Electrical3
  • Kitchens1
  • Remodels1
  • Additions1
  • Plumbing1

Permit types

As the building departments classify them.

  • SHT MTL12
  • MECH2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 13, 2026SHT MTLinstall a single zone gas warm air heat for1st & 2nd floor living space using goodman 96% furnace, 13 seer goodman condenser & matching evaporator coil. installRandolph Town City$16,800
Mar 23, 2026SHT MTLinstall 2 zones of gas warm air heat with central a/c for the first and second floors. added zone dampers, a circuit board panel, trunk line, runouts and returnFalmouth Town—
Mar 11, 2026SHT MTLinstall 2 goodman gas furnaces and condensers with 2 zone dampers and control board for basement/1st floor and 2nd floor/attic, 1 erv unit for the basement /1stFalmouth Town—
Mar 11, 2026SHT MTLinstall a single zone 2.0 fujitsu ducted heat pump system from the attic down with one single return and control wiring.Falmouth Town—
Apr 1, 2025SHT MTLinstall 2 2.0 amana "s" heat pump systems for the 1st and 2nd floor living space. also added a 5kw backup heat kit for both systems.Taunton City$26,800
Feb 5, 2025SHT MTLinstall a single zone of gas warm air heat from attic down for the 1st and 2nd floor using amana equipment, erv unit and vent bathroom fans.Falmouth Town—
Jan 14, 2025SHT MTLto install a hydro system with the duct work under the crawl space with central a/c for the new addition.Falmouth Town—
Jan 9, 2025SHT MTLinstall a single furnace, a/c condenser and evaporator from the attic down with motorized damper system to give zoning between 1st and 2nd floor living space. aFalmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed6
  • Issued5
  • Completed2
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.