Contractor · General building

NOVAK RICHARD H TRUSTEE

14 building permits since 2008 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
2008–2023
Latest permit
Jun 15, 2023

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

02.55
5
2011201320152023
View as table
YearPermits
20081
20112
20121
20132
20145
20151
20171
20231

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing4
  • Electrical4
  • Remodels3
  • Solar2
  • Bathrooms2
  • Demolition2
  • Windows & doors2
  • Gas1
  • HVAC1
  • Kitchens1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jun 15, 2023BuildingWindow/door permit to replace one window or door in-kind at an existing habitable structure. Bedroom windows need 5.7 sq ft minimum net clear opening. Refer to Santa Cruz County—
Mar 6, 2017BuildingLRA, Central Fire, RPR: EMERGENCY REPAIR Repair-in-kind 1,340sq ft. sea retaining wall at an existing SFD Install listed smoke detectors and carbon monoxide alaSanta Cruz County—
Aug 20, 2015BuildingAdd lights and outlets with hose bib at an 120 sq ft storage shed.Santa Cruz County—
Jul 15, 2014BuildingInstall a roof mounted photovoltaic electrical system not to exceed 32 feet in height on a single family dwelling. The Building Inspector may require roof strucSanta Cruz County—
Jun 3, 2014BuildingChange order to B-134015 (Rem) to include demo existing masonry fire place and install new insert fire place.Santa Cruz County—
Apr 28, 2014BuildingEL: Install photovoltaic electrical system not to exceed 32 feet in height on a single family dwelling. The Building Inspector may require roof structural plansSanta Cruz County—
Apr 8, 2014BuildingChange order to BP B-134015 to include convert family room to covered porch, remove and reconstruct entry porch, construct new gables, revise roof overhang at fSanta Cruz County—
Jan 13, 2014BuildingInterior remodel to add a second Bathroom and to reconfigure Kitchen, Living Rm/Dining Rm., relocate Laundry Rm., add (n) Pantry, reconfigure master Bath & HallSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.