Contractor · Specialty (solar, fire, telecom)
CLEAN SOLAR, INC
209 building permits since 2010 in Mountain View city, CA; Los Altos Hills town, CA and Santa Cruz city, CA, across 5 counties — $1,871,697 in reported job value over 160 permits that state one.
- Building permits
- 209
- Reported job value
- $1.9M
- Active
- 2010–2026
- Latest permit
- Oct 23, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mountain View city, CA116
- Los Altos Hills town, CA51
- Santa Cruz city, CA10
- Capitola city, CA4
- Fremont city, CA4
- San Bruno city, CA3
- Saratoga city, CA3
- Contra Costa County, CA2
- Santa Clara County, CA2
- Santa Cruz County, CA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2010 | 4 |
| 2011 | 7 |
| 2012 | 2 |
| 2013 | 13 |
| 2014 | 9 |
| 2015 | 13 |
| 2016 | 8 |
| 2017 | 9 |
| 2018 | 17 |
| 2019 | 11 |
| 2020 | 12 |
| 2021 | 22 |
| 2022 | 23 |
| 2023 | 7 |
| 2024 | 11 |
| 2025 | 11 |
| 2026 (YTD) | 30 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar151
- Electrical48
- Battery storage44
- EV chargers9
- Roofing8
- Additions3
- Electric meters3
- New construction1
Permit types
As the building departments classify them.
- BL, EL, CH59
- BL, CH, EL38
- Electrical20
- Other19
- SOLAR OR PHOTOVOLTAIC16
- EL13
- PV & ES Systems10
- ELECTRICAL8
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 23, 2026 | B-Residential | Install 11.44 kW DC rooftop solar PV (26 Hyundai HiS-T440NF(BK) modules) with 1 Tesla Powerwall 3 (11.5 kW integrated inverter) + 1 Powerwall 3 expansion pack, | Capitola City | — |
| Oct 1, 2026 | PVR | Installation of PV System and Energy Storage System consisting of: 22 modules, roof mounted, 9.68kw, 1 Tesla Powerwall 3, 1 Tesla backup Gateway 3 | Contra Costa County | $56,682 |
| Sep 2, 2026 | BL, EL, CH | BLDG26-20093: REMOVE & REINSTALL (10.12KW) ROOFTOP PHOTOVOLTAIC SYSTEM, INSTALL (2) (13.5KWH) ENERGY STORAGE SYSTEMS, AND (1) 125AMP LOAD CENTER (ORIGINAL PHOTO | Mountain View City | $2,000 |
| Aug 27, 2026 | BL, EL, CH | BLDG26-19877: INSTALL (1) ENERGY STORAGE SYSTEM (10KWH) WITH 200 AMP LOAD CENTER ON EXISITING ROOFTOP PHOTOVOLATIC SYSTEM | Mountain View City | $2,000 |
| Jul 22, 2026 | EL | RESIDENTIAL ELECTRICAL SERVICE UPGRADE.VALUATION=6500; SAME LOCATION=YES; PANEL AMPS=125; | Mountain View City | $6,500 |
| Jul 13, 2026 | Residential Building Permit | Repair/replacement of a structural post within the garage. It is a 6x6 DF #2. | Scotts Valley City | $9,600 |
| Jul 10, 2026 | PVR | Addition Installation of roof mounted Solar PV System consisting of: 6 modules, 2.64kw | Contra Costa County | $12,418 |
| May 29, 2026 | Electrical Permit | Removal of Subpanel & Relocate Circuits to Main Panel and Modification of Existing PV System and Energy Storage System consisting of: 1 Tesla Backup Switch and | Scotts Valley City | $3,750 |
Permit status
Where its permits stand, as the departments report them.
- Not stated168
- Finaled12
- Completed11
- Active10
- Issued5
- Expired2
- Reviews in progress1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- CLEAN SOLAR
- CLEANSOLAR
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.