Contractor · Specialty (solar, fire, telecom)

CLEAN SOLAR, INC

209 building permits since 2010 in Mountain View city, CA; Los Altos Hills town, CA and Santa Cruz city, CA, across 5 counties — $1,871,697 in reported job value over 160 permits that state one.

Building permits
209
Reported job value
$1.9M
Active
2010–2026
Latest permit
Oct 23, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Mountain View city, CA116
  • Los Altos Hills town, CA51
  • Santa Cruz city, CA10
  • Capitola city, CA4
  • Fremont city, CA4
  • San Bruno city, CA3
  • Saratoga city, CA3
  • Contra Costa County, CA2
  • Santa Clara County, CA2
  • Santa Cruz County, CA2

Permits by year

By issue date (application date where there is none).

01530
30
201120142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20104
20117
20122
201313
20149
201513
20168
20179
201817
201911
202012
202122
202223
20237
202411
202511
2026 (YTD)30

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar151
  • Electrical48
  • Battery storage44
  • EV chargers9
  • Roofing8
  • Additions3
  • Electric meters3
  • New construction1

Permit types

As the building departments classify them.

  • BL, EL, CH59
  • BL, CH, EL38
  • Electrical20
  • Other19
  • SOLAR OR PHOTOVOLTAIC16
  • EL13
  • PV & ES Systems10
  • ELECTRICAL8

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 23, 2026B-ResidentialInstall 11.44 kW DC rooftop solar PV (26 Hyundai HiS-T440NF(BK) modules) with 1 Tesla Powerwall 3 (11.5 kW integrated inverter) + 1 Powerwall 3 expansion pack, Capitola City—
Oct 1, 2026PVRInstallation of PV System and Energy Storage System consisting of: 22 modules, roof mounted, 9.68kw, 1 Tesla Powerwall 3, 1 Tesla backup Gateway 3Contra Costa County$56,682
Sep 2, 2026BL, EL, CHBLDG26-20093: REMOVE & REINSTALL (10.12KW) ROOFTOP PHOTOVOLTAIC SYSTEM, INSTALL (2) (13.5KWH) ENERGY STORAGE SYSTEMS, AND (1) 125AMP LOAD CENTER (ORIGINAL PHOTOMountain View City$2,000
Aug 27, 2026BL, EL, CHBLDG26-19877: INSTALL (1) ENERGY STORAGE SYSTEM (10KWH) WITH 200 AMP LOAD CENTER ON EXISITING ROOFTOP PHOTOVOLATIC SYSTEMMountain View City$2,000
Jul 22, 2026ELRESIDENTIAL ELECTRICAL SERVICE UPGRADE.VALUATION=6500; SAME LOCATION=YES; PANEL AMPS=125;Mountain View City$6,500
Jul 13, 2026Residential Building PermitRepair/replacement of a structural post within the garage. It is a 6x6 DF #2.Scotts Valley City$9,600
Jul 10, 2026PVRAddition Installation of roof mounted Solar PV System consisting of: 6 modules, 2.64kwContra Costa County$12,418
May 29, 2026Electrical PermitRemoval of Subpanel & Relocate Circuits to Main Panel and Modification of Existing PV System and Energy Storage System consisting of: 1 Tesla Backup Switch and Scotts Valley City$3,750

Permit status

Where its permits stand, as the departments report them.

  • Not stated168
  • Finaled12
  • Completed11
  • Active10
  • Issued5
  • Expired2
  • Reviews in progress1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • CLEAN SOLAR
  • CLEANSOLAR

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.