Contractor · Electrical

Jeremiah Alexander Johnson

1,785 building permits since 2013 in Orleans Parish, LA.

Building permits
1,785
Reported job value
—
Active
2013–2026
Latest permit
Oct 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Orleans Parish, LA1.8K

Permits by year

By issue date (application date where there is none).

0250500
428
20142017202020232026*
* 2026 is year to date.
View as table
YearPermits
20138
20148
201522
201615
201716
201831
201921
2020145
2021229
2022428
2023286
2024283
2025219
2026 (YTD)74

Type of work

Permits describing each kind of work; one permit can cover several.

  • Generators1.7K
  • Electrical996
  • Gas727
  • Electric meters114
  • Plumbing90
  • Remodels9
  • Roofing6
  • Windows & doors5
  • HVAC3
  • Solar3

Permit types

As the building departments classify them.

  • Accessory Structure552
  • Renovation (Non-Structural)1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 20, 2026—We will supply and install a 24Kw Generac air-cooled generator. The generator will be placed on the left rear property line in the backyard of the house. We wilOrleans Parish—
Oct 1, 2026—Install a 27 kW Generac RG02724ANAX low-speed generator (1800 RPM) on the right side of the house, mounted on a 48" aluminum stand anchored with concrete footerOrleans Parish—
Sep 28, 2026—Install new 1-1/4" natural gas piping from existing gas services to one 22kW Generac standby generator. Gas piping to run along exterior wall and connect to genOrleans Parish—
Sep 16, 2026—We will supply and install a 26 KW AC Generac generator operating at 3600 rpm. The generator will be placed on the left side of the house. We will construct an Orleans Parish—
Sep 14, 2026—Install a new 22 kW natural gas standby generator with a 200-amp automatic transfer switch. Generator will be installed on an aluminum stand with concrete footeOrleans Parish—
Sep 10, 2026—Install a new 22 kW natural gas standby generator with a 200-amp automatic transfer switch. Generator will be installed on an aluminum stand with concrete footeOrleans Parish—
Sep 10, 2026—We will supply and install a 24Kw Generac air-cooled generator. The generator will be placed on the left rear property line in the backyard of the house. We wilOrleans Parish—
Sep 10, 2026—We will supply and install a 26 KW AC Generac generator operating at 3600 rpm. The generator will be placed on the left side of the house. We will construct an Orleans Parish—

Permit status

Where its permits stand, as the departments report them.

  • Issued837
  • C/o issued580
  • Finaled260
  • Closed91
  • Not stated8
  • Expired4
  • Void3
  • Approved1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.