Contractor · Electrical
MAC GENERAL POWER SOLUTIONS LLC
14 building permits since 2024 in Arlington County, VA — $1,300,000 in reported job value over 1 permits that state one.
- Building permits
- 14
- Reported job value
- $1.3M
- Active
- 2024–2026
- Latest permit
- May 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Arlington County, VA14
Permits by year
By issue date (application date where there is none).
0510
9
202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2024 | 1 |
| 2025 | 9 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- Remodels6
- HVAC3
- Bathrooms1
- Plumbing1
- Demolition1
- Fire sprinklers1
Permit types
As the building departments classify them.
- Electrical9
- Fire3
- CTBO2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 28, 2026 | Fire | Existing fire alarm system with new devices, new NACP, and new amplifier. | Arlington County | — |
| May 1, 2026 | Electrical | Existing building with new service to include new panels, lighting, and power. | Arlington County | — |
| May 1, 2026 | Electrical | Existing building with new service to include new panels, lighting, and power. | Arlington County | — |
| Jan 12, 2026 | Electrical | Tenant build out, most of the space to remain, reconfiguring of equipment and Lobby, Level 1 Alteration, no mechanical or plumbing alterations. | Arlington County | — |
| Dec 2, 2025 | CTBO | Location: 2121 Crystal Drive, Suite 302, Arlington, VA 22202 Electrical scope is adding a 30 kVA transformer and panelboard to serve additional receptacles in R | Arlington County | — |
| Nov 24, 2025 | Electrical | Replacement of existing failing switchboard with new code compliant switchboard. 3,000A, 3-phase, 4-wire, 120/208V. Reuse existing feeders to new switchboard. P | Arlington County | — |
| Sep 29, 2025 | Electrical | Commercial renovation to existing space to include new power distribution, power, lighting, and tele/data. | Arlington County | — |
| Aug 19, 2025 | Electrical | New Light fixtures, new light fixtures in restroom, new lighting controls, new switching, new power, rough in tele/data av and security. | Arlington County | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled11
- Pending2
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.