Contractor · Roofing

JOHN CAMPIGLIA CONSTRUCTION

14 building permits since 1998 in Santa Cruz County, CA and Santa Cruz city, CA — $30,500 in reported job value over 3 permits that state one.

Building permits
14
Reported job value
$30.5K
Active
1998–2008
Latest permit
Nov 17, 2008

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA11
  • Santa Cruz city, CA3

Permits by year

By issue date (application date where there is none).

024
4
19982001200320062008
View as table
YearPermits
19983
20001
20011
20021
20031
20054
20061
20071
20081

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing12
  • Remodels1
  • Plumbing1
  • Electrical1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Building11
  • Roofing2
  • Commercial Building1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 17, 2008BuildingRERF: Tear off roof at an existing SFD and install new sheathing if required and class B or better composition shingles to match existing color (going from tar Santa Cruz County—
Apr 30, 2007BuildingRERF: Tear off roof and replace with class B or better composition shingles at an existing SFD.Santa Cruz County—
Sep 26, 2006BuildingTear off roof and replace with class B or better composition shingles, to include torch down at flats, at an existing SFD.Santa Cruz County—
Aug 8, 2005BuildingTear-off existing shake roofing, install sheathing and reroof with comp. shingles class B or better at an existing SFD.Santa Cruz County—
Jul 26, 2005BuildingTear off roofing at existing SFD and replace with Class B or better comp shingles.Santa Cruz County—
Apr 13, 2005BuildingRPR: Repair-in-Kind to replace dry rot & termite repair at the mud- siles & subfloors of an existing motel complex not exceed 10% of structure. Replace-in-kind Santa Cruz County—
Jan 11, 2005BuildingTear off roofing at an existing SFD and install new sheathing as required and class B or better comp. shingle roofing.Santa Cruz County—
Jul 22, 2003BuildingTear off shake and add sheathing replace with class B or better compositionshingles at an existing SFD.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Void1

Also on file as

Spellings on its permits, combined into this profile because they work the same area:

  • JOHN CAMPIGLIA
  • JOHN CAMPIGLIA CONST

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.