Contractor · Electrical

GT ELECTRIC SOLUTIONS LLC

14 building permits since 2018 in Boulder city, CO; Thornton city, CO and Broomfield County, CO, across 3 counties — $193,094 in reported job value over 12 permits that state one.

Building permits
14
Reported job value
$193.1K
Active
2018–2026
Latest permit
Sep 8, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Boulder city, CO6
  • Thornton city, CO3
  • Broomfield County, CO2
  • Adams County, CO1
  • Brighton city, CO1
  • Northglenn city, CO1

Permits by year

By issue date (application date where there is none).

01.53
3
2018202220242026*
* 2026 is year to date.
View as table
YearPermits
20181
20201
20223
20233
20242
20251
2026 (YTD)3

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • HVAC3
  • Remodels2
  • Roofing2
  • Additions2
  • EV chargers2
  • Electric meters2
  • Kitchens1
  • Plumbing1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Electrical Permit5
  • B-Add/Alt Electric Service Change2
  • Electrical2
  • Residential Alteration2
  • Electrical Service Change1
  • Mechanical Permit1
  • Residential Electrical - Subpanel or Service Change up to 200 amps1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 8, 2026Residential Electrical - Subpanel or Service Change up to 200 ampsElectrical for new HVACAdams County$3,000
May 29, 2026Electrical PermitPanel Replacement & Service upgrade from 150A -> 200A for single family attached dwelling. - Upgrade grounding to include ground rods and new #4 CW bonding. IntBoulder$3,200
Apr 6, 2026Mechanical PermitReplace 2 ducted swamp coolers with 2 ducted mini-split systems. Add return and new electrical. Add 1 mini-split system with wall head for kitchen/dining area. Boulder$49,000
Jun 13, 2025Electrical Service ChangeNew 200AMp service upgraded from 125Amp. Replace 125Amp Federal Pacific interior panel w/ new Siemens 125A 20/40. Upgrade & relocate old meter socket (Old meterNorthglenn City$4,200
Sep 27, 2024Electrical PermitElectrical Scope per Engineer: Addition of 8 new flower lights to each existing flower room. All new circuits to be on panel C.Boulder$19,434
Apr 16, 2024ElectricalElectricalBrighton City$200
Dec 13, 2023Electrical PermitInstallation of 8 Level 2 EV chargers.Boulder$33,000
May 19, 2023Electrical PermitInstallation of 4 level 2 EV charging stationsBoulder$53,000

Permit status

Where its permits stand, as the departments report them.

  • Completed7
  • Closed3
  • Not stated2
  • Active1
  • Issued1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.