Contractor · Electrical
GREEN HOME SYSTEMS TX INC
14 building permits since 2025 in Sacramento County, CA; Los Angeles city, CA and Riverside city, CA, across 6 counties — $272,690 in reported job value over 9 permits that state one.
- Building permits
- 14
- Reported job value
- $272.7K
- Active
- 2025–2026
- Latest permit
- Oct 9, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento County, CA4
- Los Angeles city, CA3
- Riverside city, CA2
- Benicia city, CA1
- San Bernardino County, CA1
- Elk Grove city, CA1
- Pleasanton city, CA1
- Sacramento city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2025 | 3 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar12
- Battery storage9
- Electrical6
- Roofing1
- Plumbing1
- Water heaters1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical5
- SolarApp3
- Residential2
- MISR1
- ONLINE SOLAR APP PERMIT1
- Single Family1
- SolarAPP+ Solar Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 9, 2026 | MISR | Installation of Energy Storage Tesla Powerwall 3 and Tesla Expansion Unit to an existing solar system | Sacramento County | $15,000 |
| Jul 8, 2026 | SolarAPP+ Solar Permit | PV+ST 16 solar modules 1 ESS + 1 battery expansion | Benicia City | $44,000 |
| Jun 17, 2026 | Single Family | 0kw Solar PV System, 13.5 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out | Sacramento | $33,000 |
| Jun 3, 2026 | SolarApp | SolarApp ID: SA20260521-2133-192-16375-A; INSTALL ROOF MOUNTED PV SYSTEM CONTAINING 12 MODULES AND 1 BATTERY | Sacramento County | $5,000 |
| Mar 31, 2026 | Electrical | Residential roof top pv 8.8kw (dc) | (20) modules | (1) ess/inverter [tesla powerwall 3] | (e) 200a msp | San Bernardino County | — |
| Mar 23, 2026 | Electrical | Photovoltaic roof mounted solar system - 4.2kw, 10 modules + (n) 10kwh enphase iq battery 10c energy storage system + (n) 125a combiner panel + (n) iq meter col | Pleasanton City | — |
| Feb 3, 2026 | Electrical | Changes to online standard plan 25041-90000-58785. Original description: installation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, | Los Angeles City | — |
| Jan 27, 2026 | Electrical | Changes to approved set under delta 2 and 3. | Los Angeles City | — |
Permit status
Where its permits stand, as the departments report them.
- Active4
- Closed3
- Issued3
- Finaled1
- Not stated1
- Withdrawn1
- Reviews in progress1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.