Contractor · Electrical

Electric Advantage

14 building permits since 2023 in Rockville city, MD.

Building permits
14
Reported job value
—
Active
2023–2026
Latest permit
Sep 9, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Rockville city, MD14

Permits by year

By issue date (application date where there is none).

024
4
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20234
20243
20253
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical11
  • EV chargers4
  • HVAC2
  • Windows & doors1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 9, 2026—Monetary Contribution for EV ChargingRockville City—
Aug 3, 2026—Replace faulty shunt trip breaker serving Elevator #2.Rockville City—
May 21, 2026—Install and provide new 100-amp single phase sub-panel behind door. Install and provide four 20-amp circuits and receptacles in ceiling for new cord reels. InstRockville City—
Jan 29, 2026—Install new light fixtures 2' x2' and 2' x 4' fixtures Install new exit lights. Swap of receptacles and switches one for one. Replace one two section panel.Rockville City—
Oct 29, 2025—Provide and install (4) duct smoke detectors and (2) relay modules.Rockville City—
Sep 11, 2025—1) Repair main Feeder on line side which had strands removed.2) Repair two double taps on main circuit breaker that feed roof top units.Rockville City—
Jun 27, 2025—Replace existing fire alarm system throughout building.Rockville City—
Oct 2, 2024—Install Three new circuits and five receptaclesRockville City—

Permit status

Where its permits stand, as the departments report them.

  • Closed10
  • Expired3
  • Issued1

Also on file as

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.