Contractor · Plumbing
E&J Elite Plumbing, INC
14 building permits since 2019 in Merced city, CA and San Pablo city, CA, across 2 counties — $85,654 in reported job value over 11 permits that state one.
- Building permits
- 14
- Reported job value
- $85.7K
- Active
- 2019–2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Merced city, CA13
- San Pablo city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 3 |
| 2022 | 1 |
| 2024 | 1 |
| 2025 | 5 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing14
- Water heaters9
- Roofing5
- Windows & doors5
- Gas4
- HVAC4
- Electrical3
Permit types
As the building departments classify them.
- Plumbing7
- ELEC., PLUMB., MECH3
- Backflow1
- MISC. UTILITY PERMITS1
- OTHER FIRE PERMITS1
- PLUMBING/WATER HEATER1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | Plumbing | Water heater replacement. ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESSS PORTAL. CONTRACTOR OR PROPERTY OWNER MUST BE ONSITE AT TIME OF INSPECTION | Merced City | $1,875 |
| Jun 23, 2026 | Plumbing | Water heater replacement. WATER HEATER INSTALLED ACCORDING TO MANUFACTURE’S SPECIFICATIONS. ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESSS PORTAL. | Merced City | $1,875 |
| Jun 22, 2026 | Plumbing | Water heater replacement 40 gallon. WATER HEATER INSTALLED ACCORDING TO MANUFACTURE’S SPECIFICATIONS. ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCES | Merced City | $1,875 |
| Oct 30, 2025 | Plumbing | ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESS PORTAL. CONTRACTOR OR PROPERTY OWNER MUST BE ONSITE AT TIME OF INSPECTION. INSPECTION WINDOWS ARE AS | Merced City | $1,800 |
| Sep 29, 2025 | Plumbing | Water heater replacement 50 gallon natural gas PLEASE READ ENTIRE NOTIFICATION TO AVOID DELAY AND MAINTAIN A STREAMLINED PERMITTING PROCESS. INSPECTIONS TO BE S | Merced City | $1,800 |
| Sep 29, 2025 | Plumbing | Water heater replacement for 50 gallon natural gas | Merced City | $1,800 |
| Sep 26, 2025 | Plumbing | Replace existing water heater. WATER HEATER INSTALLED ACCORDING TO MANUFACTURE’S SPECIFICATIONS. INSPECTIONS ARE CONDUCTED 8-12 1-4 M-F AND ARE SCHEDULED BY LOG | Merced City | $1,800 |
| Jul 21, 2025 | Backflow | Install new 2" back flow per city requirements in flower bed | Merced City | — |
Permit status
Where its permits stand, as the departments report them.
- Issued13
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.