Contractor · Electrical

EDISON POWER LLC

14 building permits since 2023 in Arlington County, VA.

Building permits
14
Reported job value
—
Active
2023–2026
Latest permit
Oct 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Arlington County, VA14

Permits by year

By issue date (application date where there is none).

048
7
2023202420252026*
* 2026 is year to date.
View as table
YearPermits
20232
20247
20251
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical14
  • Kitchens2
  • Remodels1

Permit types

As the building departments classify them.

  • Electrical14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 30, 2026ElectricalInstallation for one dedicated circuit 120 volt 20 amp for sump pump terminated to a GFCI receptacleArlington County—
Oct 29, 2026ElectricalInstallation for one dedicated circuit 120 volt 20 amp for sump pump terminated to a GFCI receptacleArlington County—
Oct 21, 2026Electricalinstallation for two dedicated circuits 120 Volt 20 amp for sump pump terminated to a GFCI receptaclesArlington County—
Aug 28, 2026ElectricalNV Waterproofing / Matthew Ford Installation for one dedicated circuit 120 volt 20 amp for sump pump terminated to a GFCI receptacleArlington County—
Feb 18, 2025ElectricalInstallation of one 120 volt 20 amp dedicated circuit terminated at a GFCI receptacle for sump pump.Arlington County—
May 8, 2024ElectricalNV WATERPROOFING / TOM MULKERIN Install one dedicated 120 volt 20 amp circuit for sump pump terminated to a GFCI outlet.Arlington County—
Apr 19, 2024ElectricalNV waterproofing / Sal Arrona Installation of one dedicated circuit 120 volt 20 amp for sump pump system terminated on a GFCI recepatcleArlington County—
Mar 19, 2024ElectricalInstall one dedicated circuit 120 volt 20 amp for sump pump with GFCI outletArlington County—

Permit status

Where its permits stand, as the departments report them.

  • Finaled11
  • Pending3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.