Contractor · HVAC
EASY HEAT AND AIR
14 building permits since 2023 in Sacramento city, CA; Elk Grove city, CA and Sacramento County, CA, across 2 counties — $116,830 in reported job value over 14 permits that state one.
- Building permits
- 14
- Reported job value
- $116.8K
- Active
- 2023–2026
- Latest permit
- Aug 11, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA9
- Elk Grove city, CA3
- Sacramento County, CA1
- Davis city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 5 |
| 2024 | 3 |
| 2025 | 2 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- HVAC14
- Roofing1
- Heat pumps1
- Electrical1
Permit types
As the building departments classify them.
- Single Family7
- Duplex2
- ONLINE RESIDENTIAL MECHANICAL2
- HACR1
- MECHANICAL1
- MECHANICAL RESIDENTIAL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Aug 11, 2026 | MECHANICAL RESIDENTIAL | APT B: REPLACE HVAC SYS | Davis City | $7,000 |
| Jul 29, 2026 | ONLINE RESIDENTIAL MECHANICAL | C/O HP SPLIT SYSTEM LIKE FOR LIKE | Elk Grove City | $7,000 |
| Apr 2, 2026 | Single Family | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the ex | Sacramento | $9,000 |
| Dec 24, 2025 | Single Family | No Duct Work Permitted. Change-out Split System (all-electric heat pump) to Split System (all-electric heat pump). The existing unit shall be removed. The new u | Sacramento | $8,790 |
| Aug 18, 2025 | ONLINE RESIDENTIAL MECHANICAL | Replace Condenser, Heater, and Coil | Elk Grove City | $8,000 |
| Nov 11, 2024 | Single Family | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the ex | Sacramento | $8,790 |
| Aug 20, 2024 | Single Family | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the ex | Sacramento | $8,790 |
| Apr 27, 2024 | Single Family | No Duct Work Permitted. Change-out Split System to Split System. The existing unit shall be removed. The new unit shall be placed in the same location as the ex | Sacramento | $8,790 |
Permit status
Where its permits stand, as the departments report them.
- Issued11
- Closed1
- Expired1
- Completed1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.