Contractor · Electrical

CROSS DOUGLAS A & NIGELE

14 building permits since 2010 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
2010–2024
Latest permit
Jan 18, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

024
4
2011201920222024
View as table
YearPermits
20102
20111
20174
20191
20212
20221
20232
20241

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical7
  • Roofing4
  • Electric meters4
  • HVAC3
  • Plumbing3
  • Heat pumps2
  • Gas1
  • Kitchens1
  • Remodels1
  • Bathrooms1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 18, 2024BuildingNote state license type and must have W/C Ins. Tear off or overlay roof at an existing structure <600 sq ft, install new sheathing as required with class “B” orSanta Cruz County—
Sep 12, 2023BuildingNote state license type and must have W/C Ins. Tear off or overlay roof at an existing structure, install new sheathing as required with class “B” or better appSanta Cruz County—
Mar 14, 2023BuildingLike for like replacement of siding due to storm damage due to storm damage at an existing SFD. Install or verify listed smoke detectors and carbon monoxide alaSanta Cruz County—
Apr 6, 2022BuildingReplace nob and tube wiring with Romex and upgrade 17 outlets, and replace the existing 100A sub panel in the laundry room area.. Wood panel replacement with shSanta Cruz County—
May 5, 2021BuildingZayante FPD Work to rectify open CODE case NV24574; Install electrical at existing shed (120sq) shed "A" install (2) subpanels, (5) outlets and (4) lights. RemoSanta Cruz County—
May 5, 2021BuildingZayante FPD Work to rectify open CODE case NV24574; Install electrical at existing shed (120sq) shed "B" install (1) subpanels, (5) outlets and (4) lights. RemoSanta Cruz County—
Feb 11, 2019BuildingReplace electric service panel, due to tree damage with new 200A service panel with (3) meters at an existing SFD, with (2) additional units. Install listed smoSanta Cruz County—
Dec 26, 2017BuildingInstall a new gas line from the existing propane tank to a new generator, (generator will not be connected to the main service panel, extension cord use only) aSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed12
  • Active1
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.