Contractor · General building
CLEAN LINE PLUMBING LLC
14 building permits since 2021 in Howard County, MD; Anne Arundel County, MD and Rockville city, MD, across 3 counties.
- Building permits
- 14
- Reported job value
- —
- Active
- 2021–2026
- Latest permit
- Sep 7, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Howard County, MD10
- Anne Arundel County, MD2
- Rockville city, MD2
Permits by year
By issue date (application date where there is none).
02.55
5
202120222023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 3 |
| 2024 | 1 |
| 2025 | 3 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing12
- Remodels10
- Additions10
- Bathrooms5
- Kitchens3
- Gas2
- HVAC2
- Water heaters2
- Pools & hot tubs2
- Electrical1
Permit types
As the building departments classify them.
- Residential Plumbing Addition Alteration Permit9
- Gas Permit2
- Commercial Plumbing Addition Alteration Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 7, 2026 | Gas Permit | one furnace and one gas Range | Anne Arundel County | — |
| Aug 10, 2026 | — | Need it for mechanical permit | Rockville City | — |
| Jul 21, 2026 | Gas Permit | gas water heater replacement | Anne Arundel County | — |
| Apr 23, 2026 | Residential Plumbing Addition Alteration Permit | SFD/we will add one washer box, one laundry sink and one sump pump | Howard County | — |
| Mar 11, 2026 | Residential Plumbing Addition Alteration Permit | SFD/we are doing two full bathrooms on the first-floor new addition FIXTURES: (2) toilets, (2) lavatories, (2) bath tubs and one hose bib, everything on the fir | Howard County | — |
| Mar 26, 2025 | Residential Plumbing Addition Alteration Permit | SFD/kitchen remodel / one sink, one dishwasher, one disposal, one ice maker line. first floor/**3.28.25 AMENDMENT REQ TO ADD DRAIN PIPING AND WATER LINES IN THE | Howard County | — |
| Mar 18, 2025 | Residential Plumbing Addition Alteration Permit | SFD/basement - install one toilet, one vanity sink, one shower, one bar sink | Howard County | — |
| Feb 4, 2025 | — | this permit is just to complete final plumbing inspection on a expired plumbing permit, permit #PMB2021-14360 | Rockville City | — |
Permit status
Where its permits stand, as the departments report them.
- Completed10
- Closed3
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.