Contractor · General building

Claremont Homes Inc

14 building permits since 2013 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
2013–2022
Latest permit
Nov 23, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

048
7
20132014201520162022
View as table
YearPermits
20133
20147
20151
20161
20222

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms9
  • Plumbing9
  • Electrical9
  • Remodels8
  • Kitchens7
  • Roofing2
  • Windows & doors2
  • HVAC1
  • Water heaters1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Nov 23, 2022BuildingReplace electrical service panel with a new <400A service panel at an existing structure. Install listed smoke detectors and carbon monoxide alarms or combinatiSanta Cruz County—
Jan 17, 2022BuildingNote state license type and must have W/C Ins. Tear off or overlay roof at an existing structure, install new sheathing as required with class “B” or better appSanta Cruz County—
Apr 12, 2016BuildingReplace in kind/install new electric plugs, switches, lighting, venting and plumbing fixtures for kitchen/(2) bath remodel at an existing SFD. Install listed smSanta Cruz County—
Aug 12, 2015BuildingReplace in kind/install new electric plugs, switches, lighting and plumbing fixtures for kitchen/bath remodel at an existing SFD. Install listed smoke detectorsSanta Cruz County—
Nov 10, 2014BuildingTear off roof and replace with a class B or bette composition shingles at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combinatSanta Cruz County—
Oct 20, 2014BuildingInterior bath remodel at an existing SFD to include replace tub as required and install new tile. Install listed smoke detectors and carbon monoxide alarms or cSanta Cruz County—
Jul 28, 2014BuildingRepair existing 351sq.ft. deck to include deck boards and new 6"x 6" posts at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combSanta Cruz County—
Jul 1, 2014BuildingReplace water heater with associated piping and venting at an existing condominium unit (#10). Install listed smoke detectors and carbon monoxide alarms or combSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed13
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.