Contractor · General building

CFSC INC

14 building permits since 2004 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
2004–2026
Latest permit
Feb 6, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

024
4
200420052013202320252026*
* 2026 is year to date.
View as table
YearPermits
20042
20053
20131
20232
20254
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms5
  • Remodels4
  • Windows & doors4
  • Kitchens3
  • HVAC2
  • Plumbing2
  • Electrical2
  • Fire sprinklers2
  • Accessory dwelling units1
  • Gas1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Feb 6, 2026BuildingMechanical permit to install / replace fans with associated venting for renovations at an existing habitable structure. Verify and/or install listed smoke and cSanta Cruz County—
Jan 29, 2026BuildingSolarAPP+ Approval ID: SA20260129-3577-20-17836-A Install a roof mount 6.30kW, 15 modules, 1 central inverter(s), photovoltaic electrical system not to exceed 3Santa Cruz County—
Dec 16, 2025BuildingReplace 40 gallon natural gas water heater with associated piping and venting at 2718 Freedom Blvd Unit #6 . Install minimum 1.5" piping insulation for the firsSanta Cruz County—
Dec 1, 2025BuildingUNIT 4 Mechanical permit to install new / replacement wall heater insert unit with and reuse flue piping and venting to an existing habitable structure. Verify Santa Cruz County—
Apr 11, 2025BuildingPajaro Valley FPD/LRA #221371 Homekey remodel project - Interior remodel of existing 5,788sq building, existing 10-bedroom residential facility, 10 bedrooms, 9 Santa Cruz County—
Apr 11, 2025Building2714 FREEDOM BLVD Convert existing office space to a (N) 1,047 SF 2-Bedroom 1-Bathroom ADU onsite with an existing Multiunit transitional housing. Verify and/orSanta Cruz County—
Jun 1, 2023Building2716 Freedom Blvd UNIT 2 - Permit to install new kitchen cabinets, (2) GFI receptacles at existing SFD . Install listed smoke detectors and carbon monoxide alarSanta Cruz County—
May 5, 2023BuildingWindow/door permit to replace in-kind 2-5 windows or doors at an existing habitable structure. Bedroom windows need 5.7 sq ft minimum net clear opening. Refer tSanta Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Active3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.