Contractor · General building

CAMPING UNLIMITED FOR RETARDED CHILDREN

14 building permits since 1993 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
1993–2020
Latest permit
Jan 28, 2020

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

01.53
3
19931999200420172020
View as table
YearPermits
19931
19951
19993
20031
20043
20071
20172
20191
20201

Type of work

Permits describing each kind of work; one permit can cover several.

  • Bathrooms6
  • Electrical5
  • Remodels4
  • Plumbing4
  • Demolition3
  • Pools & hot tubs2
  • Solar1
  • Additions1
  • Windows & doors1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 28, 2020BuildingSR15772 Rectify Stop Work: Recognize 384 square foot addition of unconditioned space & 139 square feet of uncovered decking at existing 1,280 square foot Arts &Santa Cruz County—
Mar 6, 2019BuildingInstall new exterior 100 amp sub-panel to pool equipment room at Camp Kreme. Batch ran @ 3/11/2020 8:00:48 PMSanta Cruz County—
Nov 30, 2017BuildingSRA-High, Boulder Creek Fire Install a 23.45kw, 131 modules roof mount photovoltaic electrical system not to exceed 32 feet in height and a 22.4kw, 62 module grSanta Cruz County—
Oct 30, 2017BuildingCounty Fire - SRA = MOD/HIGH SR15772 Electrical Permit to bring existing electrical installations in cabins up to code to include securing conduit & junction boSanta Cruz County—
Dec 4, 2007BuildingRPR: Repair-in-kind (up to 10%) to cabin #4 of 10 existing cabins at a commercial camp (Camp Krem). Job to include replace siding as required (note: siding may Santa Cruz County—
Oct 4, 2004BuildingRemodel women's bathroom to include interior partitions and all new plumbing fixtures. See BP_____________ for men's restroom.Santa Cruz County—
Jun 11, 2004BuildingDemolish an existing cabin. See bp# ___________ construct a replacement 10 bed cabin with shower & bath.Santa Cruz County—
Jun 11, 2004BuildingConstruct a replacement 10 bed cabin with shower & bath. See bp# __________ demolish the existing cabin.Santa Cruz County—

Permit status

Where its permits stand, as the departments report them.

  • Completed11
  • Active2
  • Not stated1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.