Contractor · HVAC

BTU MECHANICAL

14 building permits since 2016 in Tacoma city, WA — $606,021 in reported job value over 14 permits that state one.

Building permits
14
Reported job value
$606K
Active
2016–2025
Latest permit
May 21, 2025

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Tacoma city, WA14

Permits by year

By issue date (application date where there is none).

02.55
5
2017202120232025
View as table
YearPermits
20161
20171
20203
20215
20221
20231
20241
20251

Type of work

Permits describing each kind of work; one permit can cover several.

  • HVAC13
  • Roofing4
  • Heat pumps2
  • Gas1
  • Kitchens1
  • Remodels1
  • Bathrooms1
  • Plumbing1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 21, 2025BuildingInstallation of one 8'x10' walk in cooler with refrigeration equipment. Installation of one 8'x10' walk in freezer with refrigeration equipment on commercial buTacoma City$25,000
May 13, 2024BuildingReplacement of 7.5 ton heat pump like for like in Commercial bldg.Tacoma City$30,000
Mar 2, 2023BuildingInstallation of 10 Daikin mini split hvac units on the alley side of the building. Outdoor units to be mounted on the wall. Installation of 9 mini split units oTacoma City$144,400
Dec 27, 2022BuildingReplace two roof top packaged HVAC units.Tacoma City$10,465
Oct 4, 2021BuildingInstallation of Walk-in-Cooler and Freezer with Mechanical Equipment at the Tacoma Rescue Mission.Tacoma City$155,000
Aug 26, 2021BuildingAdd supports to roofing under the hvac packaged units in reference to MECHC21-0091.Tacoma City$1,500
Aug 26, 2021BuildingSecure condensing unit on roof of building. Install walk-in cooler inside. Run refrigerant copper piping between the two.Tacoma City$4,500
May 12, 2021BuildingInstall 3 (25 ton) packaged hvac units on the roof to supply air for a grow room. There will not be CO2 enrichment. The majority of the ductwork is to be a polyTacoma City$102,000

Permit status

Where its permits stand, as the departments report them.

  • Finaled9
  • Expired3
  • Void1
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.