Contractor · Electrical

Broxton Michael % Knutsen Tamara

14 building permits since 2019 in Santa Cruz County, CA.

Building permits
14
Reported job value
—
Active
2019–2026
Latest permit
Oct 7, 2026

Where it works

Counties shaded by permits filed there.

Permits by county, fewer to more

Busiest jurisdictions

  • Santa Cruz County, CA14

Permits by year

By issue date (application date where there is none).

024
4
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20191
20201
20213
20224
20231
20241
20251
2026 (YTD)2

Type of work

Permits describing each kind of work; one permit can cover several.

  • Windows & doors3
  • HVAC2
  • Battery storage2
  • Remodels2
  • Electrical2
  • Solar1
  • Heat pumps1

Permit types

As the building departments classify them.

  • Building14

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 7, 2026BuildingPermit Extension #1 granted to permit B-244426 to 04/06/27Santa Cruz County—
Oct 7, 2026BuildingPermit Extension #1 granted to permit B-226152 to 04/06/27Santa Cruz County—
May 6, 2025BuildingPermit extension for B-226152. New expiration date is 11/6/2025Santa Cruz County—
Jul 22, 2024BuildingReplace-in-kind (1) patio door at an existing SFD. No structural alterations/changes permitted . Refer to 2 022 Energy Efficiency Standards for Mandatory RequirSanta Cruz County—
Apr 10, 2023BuildingWindow/door permit to replace in-kind 11-20 windows or doors at an existing habitable structure. Bedroom windows need 5.7 sq ft minimum net clear opening. ReferSanta Cruz County—
Nov 2, 2022BuildingReplace-in-kind 22 windows and 1 patio door at an existing SFD. No structural alterations/changes permitted. Bedroom windows need 5.7 sq ft minimum net clear opSanta Cruz County—
Apr 14, 2022BuildingConstruction Change Document #2 to Permit B-204245 to include relocating the Tesla Gateway automatic transfer switch has been relocated. Original Plans are a paSanta Cruz County—
Feb 16, 2022BuildingConstruction change document #1 to B-204245, to include plans revised to show the batteries are now stacked, the (E) combiner box has been relocated above the bSanta Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.