Contractor · Electrical

BRIAN LAW

14 building permits since 2021 in Shelby County, TN and Memphis city, TN — $691,099 in reported job value over 11 permits that state one.

Building permits
14
Reported job value
$691.1K
Active
2021–2022
Latest permit
Sep 21, 2022

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Shelby County, TN7
  • Memphis city, TN7

Permits by year

By issue date (application date where there is none).

0510
9
20212022
View as table
YearPermits
20215
20229

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical12
  • Solar11
  • Battery storage7
  • Electric meters3
  • Remodels2

Permit types

As the building departments classify them.

  • RESIDENTIAL ELECTRICAL PERMIT12
  • RESIDENTIAL ALTERATION PERMIT2

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Sep 21, 2022RESIDENTIAL ELECTRICAL PERMIT12 panel, grid tied, roof mount, 4.56kW, Solar & Battery, install on existing structureShelby County$49,184
Sep 20, 2022RESIDENTIAL ALTERATION PERMIT21 panel, grid tied, roof mount, 8.40kW, Solar & Battery, install on existing structureMemphis city$73,760
Sep 20, 2022RESIDENTIAL ALTERATION PERMIT19 panel, grid tied, roof mount, 7.60kW, Solar & Battery, install on existing structureMemphis city$68,640
Sep 20, 2022RESIDENTIAL ELECTRICAL PERMIT21 panel, grid tied, roof mount, 8.40kW, Solar & Battery, install on existing structureMemphis city$73,760
Sep 19, 2022RESIDENTIAL ELECTRICAL PERMIT19 panel, grid tied, roof mount, 7.60kW, Solar & Battery, install on existing structureMemphis city$68,640
Jun 6, 2022RESIDENTIAL ELECTRICAL PERMITService repair for Solar production meter enclosureShelby County—
Mar 21, 2022RESIDENTIAL ELECTRICAL PERMITgeneration meter socket needs to be rewired. This will need a temporary disconnect/reconnect of power.Shelby County—
Mar 17, 2022RESIDENTIAL ELECTRICAL PERMIT25 panel roof mount, 10kW, Solar & Battery, install on existing structureShelby County$83,500

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.