Contractor · Electrical
BRIAN LAW
14 building permits since 2021 in Shelby County, TN and Memphis city, TN — $691,099 in reported job value over 11 permits that state one.
- Building permits
- 14
- Reported job value
- $691.1K
- Active
- 2021–2022
- Latest permit
- Sep 21, 2022
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Shelby County, TN7
- Memphis city, TN7
Permits by year
By issue date (application date where there is none).
0510
9
20212022
View as tableHide table
| Year | Permits |
|---|---|
| 2021 | 5 |
| 2022 | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical12
- Solar11
- Battery storage7
- Electric meters3
- Remodels2
Permit types
As the building departments classify them.
- RESIDENTIAL ELECTRICAL PERMIT12
- RESIDENTIAL ALTERATION PERMIT2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 21, 2022 | RESIDENTIAL ELECTRICAL PERMIT | 12 panel, grid tied, roof mount, 4.56kW, Solar & Battery, install on existing structure | Shelby County | $49,184 |
| Sep 20, 2022 | RESIDENTIAL ALTERATION PERMIT | 21 panel, grid tied, roof mount, 8.40kW, Solar & Battery, install on existing structure | Memphis city | $73,760 |
| Sep 20, 2022 | RESIDENTIAL ALTERATION PERMIT | 19 panel, grid tied, roof mount, 7.60kW, Solar & Battery, install on existing structure | Memphis city | $68,640 |
| Sep 20, 2022 | RESIDENTIAL ELECTRICAL PERMIT | 21 panel, grid tied, roof mount, 8.40kW, Solar & Battery, install on existing structure | Memphis city | $73,760 |
| Sep 19, 2022 | RESIDENTIAL ELECTRICAL PERMIT | 19 panel, grid tied, roof mount, 7.60kW, Solar & Battery, install on existing structure | Memphis city | $68,640 |
| Jun 6, 2022 | RESIDENTIAL ELECTRICAL PERMIT | Service repair for Solar production meter enclosure | Shelby County | — |
| Mar 21, 2022 | RESIDENTIAL ELECTRICAL PERMIT | generation meter socket needs to be rewired. This will need a temporary disconnect/reconnect of power. | Shelby County | — |
| Mar 17, 2022 | RESIDENTIAL ELECTRICAL PERMIT | 25 panel roof mount, 10kW, Solar & Battery, install on existing structure | Shelby County | $83,500 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.