Contractor · Electrical

BRAVO SITE WORKS LLC

14 building permits since 2025 in North Port city, FL; Charlotte County, FL and Collier County, FL, across 3 counties — $318,572 in reported job value over 13 permits that state one.

Building permits
14
Reported job value
$318.6K
Active
2025–2026
Latest permit
Aug 28, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • North Port city, FL8
  • Charlotte County, FL4
  • Collier County, FL2

Permits by year

By issue date (application date where there is none).

0510
10
20252026*
* 2026 is year to date.
View as table
YearPermits
202510
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical13
  • Electric meters11
  • Remodels2
  • Gas1

Permit types

As the building departments classify them.

  • Commercial Electrical11
  • Building Revision1
  • Electrical1
  • Gas1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Aug 28, 2026Commercial ElectricalReplace Qty. (1) 200 amp - 120/240 volt - 1 phase existing main circuit breaker w/ Qty. (1) 100 amp main circuit breaker. Supply new 100 amp -120/240 volt - 1 pCharlotte County$8,761
Aug 20, 2026Commercial ElectricalConstruct an irrigation pump station including a 200amp-277/480 volt-3ph meter base and a fused 200 amp-600 volt-3ph service disconnect w/grounding system.North Port City$13,332
Apr 23, 2026Building RevisionInstall a new 200 Amp-3 Phase-277/480 Volt Meter Base and a Type R Disconnect w/ 200 Amp-3 Phase- 277/480 Volt Main Breaker. 11/25/2025North Port City—
Feb 5, 2026Commercial ElectricalRewire an existing 100 amp, 120/240 volt, 1 phase electrical panel with existing meter. It will be used as supply power for a CCTV security system. The main cirCharlotte County$3,854
Nov 22, 2025Commercial ElectricalInstall new 100 Amp- 1 PH-120/240 Volt Utility Service. Load will consist of Qty. (1) 20 Amp/120 Volt WP Duplex GFCI Receptacle. Meter Base will be 200A for a hCharlotte County$4,379
Nov 17, 2025Commercial ElectricalInstall a new 200 Amp-3 Phase-277/480 Volt Meter Base and a Type R Disconnect w/ 200 Amp-3 Phase- 277/480 Volt Main Breaker. 11/25/2025North Port City$8,259
Oct 1, 2025Commercial ElectricalInstall New 200 Amp-1 Phase Meter Main near Transformer and use underground wiring methodsfor supply circuit connecting to a 200 Amp Service Panel with a main bCharlotte County$8,599
Sep 3, 2025Commercial ElectricalInstall underground wiring from FPL transformer to a new 200 amp - 120/240 volt - single phase meter main. This will supply electrical energy for a pond aeratorNorth Port City$10,867

Permit status

Where its permits stand, as the departments report them.

  • Closed9
  • Issued3
  • Expired2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.