Contractor · Specialty (solar, fire, telecom)

AS ELECTRIC INC DBA EVOLUTION ENERGY

14 building permits since 2016 in Redlands city, CA; Anaheim city, CA and San Diego County, CA, across 3 counties.

Building permits
14
Reported job value
—
Active
2016–2024
Latest permit
Apr 3, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Redlands city, CA8
  • Anaheim city, CA5
  • San Diego County, CA1

Permits by year

By issue date (application date where there is none).

024
4
2016201820202024
View as table
YearPermits
20162
20171
20184
20191
20202
20221
20243

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar14
  • Roofing2
  • Electrical2
  • Battery storage1
  • New construction1

Permit types

As the building departments classify them.

  • B-BSP Solar8

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Apr 3, 2024—Photovoltaic System: Removal And Reinstallation Of Solar Ref:bld2015-00959Anaheim City—
Mar 8, 2024—Photovoltaic System: Remove And Reinstall Solar. Ref: Bld2016-05307Anaheim City—
Feb 27, 2024—Photovoltaic System: To Discontinue Solar (Ref:bld2010-02388)Anaheim City—
Feb 3, 2022—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Sep 1, 2020B-BSP SolarRESIDENTIAL: ROOF MOUNTED PHOTOVOLTAIC SYSTEM 6.400 KW AND (20) MODULES TO INCLUDE AC DISCONNECT AND SOLAR LOAD CENTERRedlands City—
Feb 13, 2020B-BSP SolarRESIDENTIAL: INSTALL (41) ROOFTOP PHOTOVOLTAIC (14.350 KW) PANELS.Redlands City—
Mar 14, 2019—Solar Thermal Hot Water System: Install (16) Mounted On Roof To Units 45 To 60. Install 1300 Gallon Non-potable Water Storage Tank On Existing Concrete Pad In BAnaheim City—
Dec 5, 2018B-BSP SolarRESIDENTIAL: 15.810 KW ROOFMOUNTED PHOTOVOLTAIC SYSTEM, (51) MODULESRedlands City—

Permit status

Where its permits stand, as the departments report them.

  • Finaled6
  • Not stated5
  • Issued3

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.