Contractor · Electrical

A P ELECTRICAL

1,834 building permits since 2013 in Los Angeles city, CA; Riverside city, CA and San Diego County, CA, across 10 counties — $956,737 in reported job value over 115 permits that state one.

Building permits
1,834
Reported job value
$956.7K
Active
2013–2026
Latest permit
Mar 27, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Los Angeles city, CA1.8K
  • Riverside city, CA19
  • San Diego County, CA10
  • Elk Grove city, CA4
  • San Bernardino County, CA2
  • Fremont city, CA2
  • Redlands city, CA2
  • Agoura Hills city, CA1
  • Anaheim city, CA1
  • Humboldt County, CA1

Permits by year

By issue date (application date where there is none).

0300600
521
20132016201920222026*
* 2026 is year to date.
View as table
YearPermits
201313
201419
201513
201631
2017263
2018302
2019521
2020239
202132
2022290
202373
20242
2026 (YTD)34

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical1.7K
  • Roofing112
  • Solar82
  • Battery storage36
  • EV chargers3
  • Electric meters3
  • Additions2
  • Accessory dwelling units1
  • Plumbing1

Permit types

As the building departments classify them.

  • Electrical1.7K
  • Bldg-Alter/Repair94
  • Residential16
  • ELECTRICAL4
  • BRES3
  • B-BSP Solar2
  • APPR1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Mar 27, 2026ElectricalPlan check for installation of a roof mount pv system on sfd to consist of a 5.400 kw dc system with (12) modulesFontana City—
Mar 20, 2026ElectricalResidential roof top pv 11.5kw - solarapp+ id: sa20260129-6255-50-1245-bSan Bernardino County—
Mar 19, 2026ElectricalInstall (13.5kwh) ess to tie into existing solar pv system: (1) tesla powerwall 3 (13.5kwh) w/ integrated inverter (11.5kw) on w. Exterior wall; (1) backup switAgoura Hills City—
Mar 13, 2026ElectricalInstallation of 16.4kw photovoltaic system. Installation of 1 tesla powerwall 3 system(s).Santa Monica City—
Mar 2, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—
Mar 2, 2026ElectricalExisting service panel upgrade to energize the solar photovoltaic system installation under permitLos Angeles City—
Feb 27, 2026Electrical1) batteryJurupa Valley City—
Feb 26, 2026ElectricalInstallation of a roof-mounted microinverter/ac module solar photovoltaic (pv) system, not exceeding 38.4kw in a 1 or 2 family dwelling.Los Angeles City—

Permit status

Where its permits stand, as the departments report them.

  • Not stated1.7K
  • Finaled86
  • Issued35
  • Active19
  • Completed17
  • Closed5
  • Additional information required1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.