Contractor · Electrical
Alexander Thibeault
14 building permits since 2020 in Fitchburg city, MA; Lunenburg town, MA and Methuen city, MA, across 3 counties — $28,551 in reported job value over 13 permits that state one.
- Building permits
- 14
- Reported job value
- $28.6K
- Active
- 2020–2026
- Latest permit
- Sep 28, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Fitchburg city, MA7
- Lunenburg town, MA4
- Methuen city, MA1
- Acton town, MA1
- Hudson town, MA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2020 | 1 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 2 |
| 2024 | 5 |
| 2025 | 2 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical14
- HVAC4
- New construction3
- Heat pumps2
- Plumbing1
- Windows & doors1
- Water heaters1
- Electric meters1
Permit types
As the building departments classify them.
- Electrical Permit13
- Electrical Permit Application1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 28, 2026 | Electrical Permit | Wiring of new 24x26 garage, lighting inside and out, general use receptacles, 240 volt welder receptacle, 240 volt mini split, garage door opener power. New 200 | Lunenburg Town | $8,000 |
| Apr 29, 2026 | Electrical Permit | Wiring to outdoor condeners for two mini split systems. 18k Btu (25 amp feed #10) and 28k btu (40 amp feed #6 AL). | Methuen Town City | $1,500 |
| Dec 8, 2025 | Electrical Permit | Install new 100 amp 208v 3 phase feed and disconnect for a new 3 phase 80 amp water heater. | Fitchburg City | $1,500 |
| Apr 1, 2025 | Electrical Permit | Replace existing 100 amp service and FPE panel. Install new round rods and new ground to water meter. | Fitchburg City | $3,000 |
| Dec 3, 2024 | Electrical Permit | Inspect wiring for vent hood after the previous hood had caught fire due to grease build up in the motor. Wiring was in good condition so the new hood was wired | Acton Town | $150 |
| Oct 9, 2024 | Electrical Permit | Add new circuit from electrical panel for an outlet at the new bar. Verify existing outlet at the bar area can be use for new dishwasher. Add new circuit from t | Fitchburg City | $1,500 |
| Oct 7, 2024 | Electrical Permit | Wiring of new 2 car garage and breezeway between garage and house. 100 amp sub panel in the garage with underground feed from the house. | Lunenburg Town | $2,000 |
| Oct 3, 2024 | Electrical Permit | Upgrade current 100 amp service and panel to 200 amp service and panel. Wire new garage and breezeway from a 100 amp sub panel in the garage. | Lunenburg Town | $4,000 |
Permit status
Where its permits stand, as the departments report them.
- Completed13
- Active1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.