Contractor · Electrical
ACCEL ELECTRIC
14 building permits since 2003 in Mesa city, AZ — $37,700 in reported job value over 10 permits that state one.
- Building permits
- 14
- Reported job value
- $37.7K
- Active
- 2003–2011
- Latest permit
- Jun 23, 2011
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Mesa city, AZ14
Permits by year
By issue date (application date where there is none).
01.53
3
2003200620082011
View as tableHide table
| Year | Permits |
|---|---|
| 2003 | 1 |
| 2005 | 3 |
| 2006 | 1 |
| 2007 | 2 |
| 2008 | 3 |
| 2010 | 2 |
| 2011 | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical13
- Electric meters2
- Remodels1
- EV chargers1
Permit types
As the building departments classify them.
- Res (OTH) -- Electrical8
- RES4
- Com (OTH) -- Electrical2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jun 23, 2011 | Res (OTH) -- Electrical | NEW 200 AMP SERVICE PANEL WITH NEW GROUNDING & BONDING & RELOCATION PER SRP SPECIFICATIONS. TO BE INSTALLED PER 2005 NEC. NO PLANS REQUIRED. FEE BASED ON 1 INSP | Mesa | $4,000 |
| Jan 6, 2011 | Com (OTH) -- Electrical | ELECTRICAL REMODEL AT EARNHARDT NISSAN TO INCLUDE: (4) 208 VOLT, 40 AMP, SINGLE PHASE BRANCH CIRCUITS TO CHARGING DOCK LOCATIONS (4) LEVEL 2 DOCKS & (1) LEVEL 1 | Mesa | $7,000 |
| Dec 27, 2010 | Com (OTH) -- Electrical | PBI - PROVIDE AND INSTALL (4) 208V, 40A BRANCH CIRCUITS AND (1) 120V, 20A BRANCH CIRCUIT FOR ELECTRIC VEHICLE CHARGING DOCKS. | Mesa | $10,000 |
| Jun 15, 2010 | Res (OTH) -- Electrical | CHANGE OUT 100 AMP ELECTRIC PANEL TO A 200 AMP PANEL. NO PLANS REQUIRED. WORK TO BE DONE PER 2005 NEC. | Mesa | $3,000 |
| Nov 12, 2008 | Res (OTH) -- Electrical | REPLACING 200AMP ELECTRIC PANEL LIKE FOR LIKE PER 2006 IEC NO PLANS REQUIRED. | Mesa | $2,200 |
| Jul 24, 2008 | Res (OTH) -- Electrical | OTC ELECTRICAL PERMIT. PANEL CHANGE OUT LIKE FOR LIKE NO PLANS REQUIRED. | Mesa | $2,500 |
| Feb 7, 2008 | Res (OTH) -- Electrical | relocate forward in order to read meter and upgrade existing electric service 125 amp to 200 amp no plans required | Mesa | $3,000 |
| Sep 10, 2007 | Res (OTH) -- Electrical | REPLACE 100 AMP ELECTRICAL SEVICE LIKE FOR LIKE, NO PLANS REQUIRED PER NEC 2005. | Mesa | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled13
- Issued1
Also on file as
The same name elsewhere
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.