Contractor · Electrical
William Smith
15 building permits since 2023 in Cambridge city, MD; Talbot County, MD and Dorchester County, MD, across 2 counties.
- Building permits
- 15
- Reported job value
- —
- Active
- 2023–2025
- Latest permit
- Nov 4, 2025
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Cambridge city, MD6
- Talbot County, MD4
- Dorchester County, MD3
- Hurlock town, MD2
Permits by year
By issue date (application date where there is none).
048
8
202320242025
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2024 | 6 |
| 2025 | 8 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical14
- Demolition1
Permit types
As the building departments classify them.
- Electrical Permit (Stand Alone)8
- Electrical Permit6
- Demolition Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Nov 4, 2025 | Electrical Permit (Stand Alone) | Wiring for septic pump | Hurlock Town | — |
| Nov 4, 2025 | Electrical Permit (Stand Alone) | Wiring for septic pump | Dorchester County | — |
| Oct 1, 2025 | Electrical Permit (Stand Alone) | Wiring for replacment residential elevator | Talbot County | — |
| Aug 27, 2025 | Electrical Permit (Stand Alone) | Replacement of bad overhead electrical service entrance | Dorchester County | — |
| Jun 10, 2025 | Demolition Permit | The house will be demolished using demolition equipment | Talbot County | — |
| May 27, 2025 | Electrical Permit (Stand Alone) | Wiring for new wash bay building & equipment | Dorchester County | — |
| May 27, 2025 | Electrical Permit (Stand Alone) | Wiring for new wash bay building & equipment | Hurlock Town | — |
| Jan 13, 2025 | Electrical Permit (Stand Alone) | Electrical Service Inspection | Talbot County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed12
- Active3
Also on file as
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.