Contractor · Plumbing
WILL FRAZIER
15 building permits since 2019 in Tacoma city, WA; Bellevue city, WA and Everett city, WA, across 3 counties — $80,235 in reported job value over 13 permits that state one.
- Building permits
- 15
- Reported job value
- $80.2K
- Active
- 2019–2026
- Latest permit
- Jul 7, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Tacoma city, WA12
- Bellevue city, WA2
- Everett city, WA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 1 |
| 2020 | 2 |
| 2021 | 1 |
| 2023 | 5 |
| 2024 | 3 |
| 2025 | 1 |
| 2026 (YTD) | 2 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Plumbing12
- Water heaters6
- Gas4
- HVAC2
- Bathrooms2
- Kitchens1
- Remodels1
- Roofing1
- Additions1
- Demolition1
Permit types
As the building departments classify them.
- Building10
- Utility Connection2
- BN1
- MECHANICAL1
- UA1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 7, 2026 | Building | installation of new kitchen sink and remodel of mop sink/storm line and existing bathroom at commercial building | Tacoma City | $9,000 |
| Jan 22, 2026 | UA | Sewer line repair | Bellevue City | — |
| Apr 2, 2025 | Utility Connection | Open Trench REPAIR of of sanitary sewer of SFD . All on private property, NO work in ROW, or Patch is needed | Tacoma City | $5,000 |
| Jun 24, 2024 | Utility Connection | Replacement of water line at duplex. No ROW. | Tacoma City | $4,500 |
| Jun 4, 2024 | Building | replace existing 34 gas CSST line from meter to water heater | Tacoma City | $5,000 |
| Jan 10, 2024 | BN | 2113 169TH AVE NE | Bellevue City | — |
| Aug 28, 2023 | Building | replace existing gas line from point of entry into floor in unit 4 under crawl space over to mechanical room and into existing piping for water heater for unit | Tacoma City | $5,160 |
| Apr 14, 2023 | Building | connect all trim out work of existing 3-compartment sink, prep sink, hand sink, water heater, mop sink, and grease trap. | Tacoma City | $5,000 |
Permit status
Where its permits stand, as the departments report them.
- Finaled7
- Issued4
- Cancelled2
- Active1
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.