Contractor · Electrical
Wendy Irvine
15 building permits since 2026 in Waterloo city, IA — $11,000 in reported job value over 1 permits that state one.
- Building permits
- 15
- Reported job value
- $11K
- Active
- 2026
- Latest permit
- Oct 19, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Waterloo city, IA15
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical14
- Windows & doors5
- Electric meters3
- HVAC2
- New construction2
- Remodels1
- Additions1
- Bathrooms1
- Plumbing1
- Water heaters1
Permit types
As the building departments classify them.
- Electrical Permit11
- BHC Electrical Permit3
- HVAC Permit1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 19, 2026 | BHC Electrical Permit | MIDAMERICAN WILL BE CUTTING POWER FIRST THING IN THE MORNING. UPGRADING THE SERVICE TO A 200AMP ON THE POLE IN FRONT OF THE HOME. WE WILL NEED AN INSPECTION SHO | Waterloo City | — |
| Sep 16, 2026 | Electrical Permit | Wiring for new furnace and ac. | Waterloo City | — |
| Sep 16, 2026 | Electrical Permit | Installation of electrical wiring for the detached garage. All electrical will be provided to match the electrical layout drawing. This will include (6) total e | Waterloo City | — |
| Sep 16, 2026 | HVAC Permit | installation of a new 80,000 BTU Heil furnace and 2.5 ton air conditioner. This will include a "Main Line" series 96% efficient single stage furnace with a fixe | Waterloo City | $11,000 |
| Sep 10, 2026 | Electrical Permit | Installation of electrical wiring for the detached garage with a new main service for the house. We will install a new Milbank meter main on the outside of the | Waterloo City | — |
| Sep 8, 2026 | BHC Electrical Permit | Installation of electrical wiring for the detached garage. This will included, power to the garage with a 60amp subfeed panel, (8) total electrical outlets, (1) | Waterloo City | — |
| Sep 1, 2026 | Electrical Permit | Installation of electrical wiring for the detached garage. | Waterloo City | — |
| Aug 12, 2026 | Electrical Permit | Customer lost a phase in his service and has health issues. We will be upgrade his service today to 200amp service. MidAmerican is cutting power cutting current | Waterloo City | — |
Permit status
Where its permits stand, as the departments report them.
- Active10
- Completed5
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.