Contractor · Electrical

Wendy Irvine

15 building permits since 2026 in Waterloo city, IA — $11,000 in reported job value over 1 permits that state one.

Building permits
15
Reported job value
$11K
Active
2026
Latest permit
Oct 19, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Waterloo city, IA15

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical14
  • Windows & doors5
  • Electric meters3
  • HVAC2
  • New construction2
  • Remodels1
  • Additions1
  • Bathrooms1
  • Plumbing1
  • Water heaters1

Permit types

As the building departments classify them.

  • Electrical Permit11
  • BHC Electrical Permit3
  • HVAC Permit1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 19, 2026BHC Electrical PermitMIDAMERICAN WILL BE CUTTING POWER FIRST THING IN THE MORNING. UPGRADING THE SERVICE TO A 200AMP ON THE POLE IN FRONT OF THE HOME. WE WILL NEED AN INSPECTION SHOWaterloo City—
Sep 16, 2026Electrical PermitWiring for new furnace and ac.Waterloo City—
Sep 16, 2026Electrical PermitInstallation of electrical wiring for the detached garage. All electrical will be provided to match the electrical layout drawing. This will include (6) total eWaterloo City—
Sep 16, 2026HVAC Permitinstallation of a new 80,000 BTU Heil furnace and 2.5 ton air conditioner. This will include a "Main Line" series 96% efficient single stage furnace with a fixeWaterloo City$11,000
Sep 10, 2026Electrical PermitInstallation of electrical wiring for the detached garage with a new main service for the house. We will install a new Milbank meter main on the outside of the Waterloo City—
Sep 8, 2026BHC Electrical PermitInstallation of electrical wiring for the detached garage. This will included, power to the garage with a 60amp subfeed panel, (8) total electrical outlets, (1)Waterloo City—
Sep 1, 2026Electrical PermitInstallation of electrical wiring for the detached garage.Waterloo City—
Aug 12, 2026Electrical PermitCustomer lost a phase in his service and has health issues. We will be upgrade his service today to 200amp service. MidAmerican is cutting power cutting currentWaterloo City—

Permit status

Where its permits stand, as the departments report them.

  • Active10
  • Completed5

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.