Contractor · Roofing

WATERPROOF ROOFING

15 building permits since 2024 in Merced city, CA and Madera city, CA, across 2 counties — $189,200 in reported job value over 15 permits that state one.

Building permits
15
Reported job value
$189.2K
Active
2024–2026
Latest permit
May 20, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Merced city, CA13
  • Madera city, CA2

Permits by year

By issue date (application date where there is none).

048
7
202420252026*
* 2026 is year to date.
View as table
YearPermits
20247
20254
2026 (YTD)4

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing15
  • Windows & doors3

Permit types

As the building departments classify them.

  • RE11 RESIDENTAIL REROOF7
  • Re-Roof/Roof Overlay5
  • RES ROOF2
  • MANUFACTURER’S SPECS FOR ROOFING MATERIAL INSTALLATION. Re-Roof/Roof Overlay1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 20, 2026Re-Roof/Roof OverlayRoof tear off Replace wood as needed Install cool roof ***ROOF NAIL AND FINAL REQUIRED*** CONTRACTOR SHALL PROVIDE A SECURE LADDER WITH A MINIMUM OF 3 RUNGS ABOMerced City$19,000
May 7, 2026RES ROOFRES RE ROOF | 3000 SQFT TEAR OFF AND INSTALLMadera City$13,000
May 5, 2026Re-Roof/Roof OverlayRoof tear off. Install cool roof. ***ROOF NAIL AND FINAL REQUIRED*** ALL INSPECTIONS MUST BE SCHEDULED THROUGH YOUR CIVIC ACCESSS PORTAL. CONTRACTOR OR PROPERTYMerced City$11,000
Feb 4, 2026MANUFACTURER’S SPECS FOR ROOFING MATERIAL INSTALLATION. Re-Roof/Roof Overlay***ON HOLD - REINSPECTION FEES REQUIRED FIRST*** Roof tear off - Install cool roof. ***ROOF NAIL AND FINAL REQUIRED*** CONTRACTOR SHALL PROVIDE A SECURE LADDER Merced City$13,000
Sep 17, 2025Re-Roof/Roof OverlayRoof tear off Install OSB Install cool roof RE-ROOF WITH TEAR OFF ***ROOF NAIL AND FINAL REQUIRED*** CONTRACTOR SHALL PROVIDE A SECURE LADDER WITH A MINIMUM OF Merced City$14,500
Sep 17, 2025Re-Roof/Roof OverlayRoof tear off. Cool roof install. ***ROOF NAIL AND FINAL REQUIRED*** CONTRACTOR SHALL PROVIDE A SECURE LADDER WITH A MINIMUM OF 3 RUNGS ABOVE ROOF LINE AND TIEDMerced City$11,000
Sep 10, 2025Re-Roof/Roof OverlayRoof tear off. Replace plywood as needed. Install cool roof. ***ROOF NAIL AND FINAL REQUIRED*** CONTRACTOR SHALL PROVIDE A SECURE LADDER WITH A MINIMUM OF 3 RUNMerced City$15,000
Sep 8, 2025RES ROOFRES RE ROOF - 22 SQUARES TEAR OFF AND INSTALLMadera City$9,500

Permit status

Where its permits stand, as the departments report them.

  • Issued13
  • Completed2

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.