Contractor · Roofing

thomas, troy

15 building permits since 2009 in Falmouth town, MA; Haverhill city, MA and Rochester city, NH, across 4 counties — $28,000 in reported job value over 2 permits that state one.

Building permits
15
Reported job value
$28K
Active
2009–2024
Latest permit
May 7, 2024

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Falmouth town, MA10
  • Haverhill city, MA2
  • Rochester city, NH2
  • Exeter town, NH1

Permits by year

By issue date (application date where there is none).

01.53
3
2010201220142024
View as table
YearPermits
20092
20102
20111
20123
20131
20141
20231
20243

Type of work

Permits describing each kind of work; one permit can cover several.

  • Roofing10
  • Plumbing5
  • Bathrooms2
  • Gas1
  • HVAC1
  • Kitchens1
  • Remodels1

Permit types

As the building departments classify them.

  • REP10
  • Plumbing Permit3
  • Mechanical Permit1
  • Plumbing1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
May 7, 2024Plumbing PermitRemove 2" hot water line and cap it off, replace about 60' of 2" cold water piping and add 15 3/4" branches for future equipment. This is a car wash we are currHaverhill City—
Mar 25, 2024Plumbing Permitreplumbing 3 bathrooms: 2 on first floor, 1 on second floor Floor 1 bathroom 1- toilet, sink, and shower Floor 1 bathroom 2- toilet sink and tub Floor 2 bathrooHaverhill City—
Jan 10, 2024Mechanical Permitinstalling 3 new combi boilers for units A,B,E and all new gas piping for boilersRochester City$15,000
Oct 19, 2023Plumbing Permitreplace all plumbing in existing 3 units of building to include the following in each unit: 1 toilet, 1 lav, 1 bathtub/shower, 1 kitchen sink, 1 lav, 1 laundry Rochester City$13,000
Nov 5, 2014REPstrip and re-roof twenty-five (25) squares; 100% of roof; gaf/timberline/30 yearFalmouth Town—
Mar 7, 2013REPstrip & re-roof with 22 squares (100%, iko, 30 yr)Falmouth Town—
Dec 17, 2012REPstrip and re-roof nineteen (19) squares; 100% of roof; gaf-elk/timberline/30 yearsFalmouth Town—
Sep 28, 2012REPstrip & re-roof with 38 squares (100%, gaf, elk, timberline, 30 yr)Falmouth Town—

Permit status

Where its permits stand, as the departments report them.

  • Closed11
  • Completed3
  • Active1

Also on file as

The same name elsewhere

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.