Contractor · General building

THOMANN ASPHALT PAVING CORP.

15 building permits since 2018 in Buffalo city, NY and Clarence town, NY — $382,382 in reported job value over 15 permits that state one.

Building permits
15
Reported job value
$382.4K
Active
2018–2026
Latest permit
Oct 2, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Buffalo city, NY13
  • Clarence town, NY2

Permits by year

By issue date (application date where there is none).

036
6
2018202420252026*
* 2026 is year to date.
View as table
YearPermits
20182
20244
20253
2026 (YTD)6

Type of work

Permits describing each kind of work; one permit can cover several.

  • Additions2
  • Demolition1

Permit types

As the building departments classify them.

  • REPAIR9
  • FENDRIVE4
  • Res. Addition1
  • Res. Garage Detached1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Oct 2, 2026FENDRIVEInstalling a new concrete driveway.<div><br></div><div>*** combination attached for 199 &amp; 197 Prospect ***&nbsp;</div>Buffalo City$18,000
Sep 16, 2026REPAIR2" Binder R&R Prior To Mill & Overlay (1,809sf): - Remove the existing asphalt to a depth of 2” and haul offsite. - Compact the existing stone subbase and instaBuffalo City$33,000
Jul 21, 2026REPAIRRebuild Drain with New Concrete Limits: - Saw cut around the perimeter of the existing drain. - Remove the deteriorated concrete and form the inside with plywooBuffalo City$10,300
Jun 4, 2026REPAIRAsphalt Overlay With Rebate Milling - 2 Areas (3,280sf):- Mill rebates to ensure a smooth transition and prevent the new asphalt from fraying away. - Clean and Buffalo City$11,500
Apr 30, 2026REPAIR3" Asphalt R&R With Base Compaction - 4 Areas (1,482sf) - Remove the existing asphalt to a depth of 3” and haul offsite. - Compact the existing stone subbase. -Buffalo City$13,400
Apr 30, 2026REPAIRConcrete Curb and Walk: - Saw cut and remove the existing concrete curb (177') and haul offsite. -Supply and install #1 stone to grade as needed. - Form & pour Buffalo City$66,000
Oct 13, 2025REPAIRGrade and install new asphalt lot, install 3 new catch basins, install 225ft of new drain pipe.&nbsp; &nbsp;*** Digeplan ***&nbsp; &nbsp;*** Plans Filed***&nbspBuffalo City$72,000
Jul 16, 2025REPAIR2inch Mill and Pave patch repair in a parking lotBuffalo City$1,700

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.