Contractor · Electrical
Ted Makalinaw
15 building permits since 2023 in Lebanon city, NH — $124,649 in reported job value over 15 permits that state one.
- Building permits
- 15
- Reported job value
- $124.6K
- Active
- 2023–2026
- Latest permit
- Oct 27, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Lebanon city, NH15
Permits by year
By issue date (application date where there is none).
02.55
5
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 1 |
| 2024 | 4 |
| 2025 | 5 |
| 2026 (YTD) | 5 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Electric meters3
- HVAC1
- Plumbing1
- Heat pumps1
- Water heaters1
Permit types
As the building departments classify them.
- Electrical Permit13
- Electrical2
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 27, 2026 | Electrical Permit | Replacing damaged lighting PVC conduit and wires in wash bay. Re-installing 60ft of PVC conduit and 12 AWG wires to re-establish lighting from one side if the w | Lebanon City | $500 |
| Jul 27, 2026 | Electrical Permit | Replacing meter can on pump station electrical service. | Lebanon City | $500 |
| Mar 18, 2026 | Electrical Permit | Installing four 120V 20A circuits for new dispatch computer cubicles. Two cubicles will be installed with two circuits at each. The circuits will orignate from | Lebanon City | $1,000 |
| Mar 12, 2026 | Electrical Permit | Installing a new 208V 15A single phase circuit for a hybrid hot water heater. Circuit will be run via an existing conduit with THHN. A disconnect switch will be | Lebanon City | $600 |
| Mar 6, 2026 | Electrical Permit | Installtion of the following circuits: 20A 3 Ø 480V For Mini-Split Condenser 20A 1 Ø 208V For Mini Split Head Units 20A 120V For Modine Heater 20A 120V For Boil | Lebanon City | $1,000 |
| Dec 11, 2025 | Electrical Permit | Upgrading landfill pumps at the west pump station from 5HP to 10HP. Installing an 80A feeder from existing 200A panel. Installing a control panel disconnect swi | Lebanon City | $50,000 |
| Dec 11, 2025 | Electrical Permit | Scope: Upgrading SCADA controls at IIC pump station and adding second primary pump with new flow meter and level sensor. Work To Be Performed: Install new flow | Lebanon City | $30,000 |
| Jul 17, 2025 | Electrical Permit | Conduit feeding power to the salt shed was damaged. Repairing conduit, upgrading wiring and adding a new sub panel at the salt shed. | Lebanon City | $3,000 |
Permit status
Where its permits stand, as the departments report them.
- Active9
- Completed4
- Not stated2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.