Contractor · Electrical
SUNGENIX ENERGY SOLUTIONS
15 building permits since 2015 in Sacramento city, CA; Menlo Park city, CA and Elk Grove city, CA, across 4 counties — $121,579 in reported job value over 9 permits that state one.
- Building permits
- 15
- Reported job value
- $121.6K
- Active
- 2015–2026
- Latest permit
- May 8, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA5
- Menlo Park city, CA4
- Elk Grove city, CA2
- Los Angeles city, CA2
- Campbell city, CA1
- Mountain View city, CA1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 2 |
| 2025 | 4 |
| 2026 (YTD) | 9 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical13
- Solar7
- EV chargers5
- Battery storage1
- Roofing1
Permit types
As the building departments classify them.
- Electrical6
- Single Family5
- ONLINE VEHICLE CHARGING PERMIT2
- Bldg-Alter/Repair1
- EL1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| May 8, 2026 | Single Family | EPC - Install EV rated outlet for plug in EV charger. Water conserving fixtures are required to be installed throughout this residence per SB 407 (Note: Residen | Sacramento | $500 |
| Apr 16, 2026 | ONLINE VEHICLE CHARGING PERMIT | Install 50A circuit in MSP for hardwired EV Charger | Elk Grove City | $1,000 |
| Jan 30, 2026 | Single Family | Install 60A circuit in MSP for hardwired Tesla EV charger to be mounted inside garage. Water conserving fixtures are required to be installed throughout this re | Sacramento | $1,200 |
| Jan 27, 2026 | ONLINE VEHICLE CHARGING PERMIT | Install 50A circuit in 125AMSP - hardwired Tesla EV Charger | Elk Grove City | $1,700 |
| Jan 21, 2026 | Electrical | Solarapp+ project id: sa20251201-8264-9-16093-a; scope: pv solar; pv system size: 3.6 kw dc; (9) pv modules: znshine, zxm7-sh108-400m, 400 watts; (1) inverter(s | Menlo Park City | — |
| Jan 21, 2026 | Electrical | Solarapp+ project id: sa20251201-8264-10-16093-a; scope: pv solar; pv system size: 3.6 kw dc; (9) pv modules: znshine, zxm7-sh108-400m; (1) inverter(s): sma sbs | Menlo Park City | — |
| Jan 21, 2026 | Electrical | Solarapp+ project id: sa20251201-8264-11-16093-a; scope: pv solar; pv system size: 3.6 kw dc; (9) pv modules: znshine, zxm7-sh108-400m, 400 watts; (1) inverter( | Menlo Park City | — |
| Jan 21, 2026 | Electrical | Solarapp+ project id: sa20251201-8264-12-16093-a; scope: pv solar; pv system size: 3.2 kw dc; (8) pv modules: znshine zxm7-sh108-400m, 400 watts; (1) inverter(s | Menlo Park City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled6
- Issued5
- Closed2
- Not stated2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.