Contractor · Electrical
SOLAR OPTIMUM INC
1,849 building permits since 2013 in Los Angeles city, CA; San Diego County, CA and Marin County, CA, across 21 counties — $8,131,584 in reported job value over 238 permits that state one.
- Building permits
- 1,849
- Reported job value
- $8.1M
- Active
- 2013–2026
- Latest permit
- Oct 1, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Los Angeles city, CA1.4K
- San Diego County, CA70
- Marin County, CA51
- Mountain View city, CA43
- Camarillo city, CA42
- Burbank city, CA33
- Vista city, CA27
- Sacramento city, CA26
- Temecula city, CA19
- Davis city, CA17
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2013 | 16 |
| 2014 | 56 |
| 2015 | 117 |
| 2016 | 73 |
| 2017 | 53 |
| 2018 | 177 |
| 2019 | 254 |
| 2020 | 287 |
| 2021 | 416 |
| 2022 | 144 |
| 2023 | 96 |
| 2024 | 35 |
| 2025 | 58 |
| 2026 (YTD) | 67 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical1.5K
- Solar866
- Battery storage180
- Roofing100
- Plumbing25
- Additions23
- Water heaters21
- EV chargers9
- HVAC4
- Electric meters4
Permit types
As the building departments classify them.
- Electrical1.4K
- RESIDENTIAL51
- Bldg-Alter/Repair34
- RESIDENTIAL ROOFTOP SOLAR SYSTEM32
- BL, CH, EL31
- Building Misc - Photovoltaic System (PV)27
- Single Family25
- Solar24
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 1, 2026 | PVR | INSTALL 25 PV PANELS | 11.0KW | (1) TESLA POWERWALL 3 | 200A SUB PANEL | Contra Costa County | $30,000 |
| Sep 15, 2026 | Single Family | 3.68kw Solar PV System, 0 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). All supply side connections, main breaker change-out | Sacramento | $7,000 |
| Aug 24, 2026 | PVR | INSTALL 16 PV PANELS | 7.36KW | Contra Costa County | $21,000 |
| Jul 23, 2026 | Solar | Install 8 PV modules (3.68KW) with 8 micro-inverters. SYMBIUM-project_c12b965f-bd66-4418-9449-64cc7664ed5c | Burbank City | — |
| Jul 2, 2026 | BL, EL, CH | BLDG26-18863 - INSTALL (1) EXPANSION UNIT (13.5KWH) FOR EXISTING ROOFTOP PHOTOVOLTAIC SYSTEM AT EXTERIOR OF RESIDENCE | Mountain View City | $1,000 |
| Jun 12, 2026 | PVR | INSTALL 19 PV PANELS | 8.36KW *adding to existing system | Contra Costa County | $16,000 |
| Jun 4, 2026 | MISR | INSTALL 19 PV PANELS | 8.36KW | (1) TESLA POWERWALL 3 *does not qualify for SolarApp+ due to 400A existing electrical panel | Sacramento County | $22,000 |
| May 27, 2026 | SolarApp | SolarApp ID: SA20260507-2133-175-1234-A; INSTALL 30 PV PANELS | 13.80KW | (1) TESLA POWERWALL 3 | Sacramento County | $32,000 |
Permit status
Where its permits stand, as the departments report them.
- Not stated1.4K
- Finaled175
- Issued97
- Completed66
- Active52
- Expired15
- Closed13
- C/o issued3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.