Contractor · Electrical
Stacey Bradley Electric, LLC
15 building permits since 2019 in Gaston County, NC; Greensboro city, NC and Harnett County, NC, across 4 counties — $47,506 in reported job value over 3 permits that state one.
- Building permits
- 15
- Reported job value
- $47.5K
- Active
- 2019–2026
- Latest permit
- Oct 14, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Gaston County, NC11
- Greensboro city, NC2
- Harnett County, NC1
- Lincoln County, NC1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 2 |
| 2020 | 1 |
| 2022 | 3 |
| 2025 | 4 |
| 2026 (YTD) | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical11
- HVAC5
- Gas2
- Generators2
- Heat pumps2
- Remodels1
- Bathrooms1
- Electric meters1
Permit types
As the building departments classify them.
- Single Trade (Residential) - Electrical4
- Electrical2
- Electrical - Commercial2
- HVAC Change Out - Gas2
- Alteration / Remodel (Residential)1
- ELECTRICAL COMMERCIAL1
- Electrical Permit1
- HVAC Changeout - Commercial Structure1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 14, 2026 | Electrical Permit | — | Lincoln County | — |
| May 15, 2026 | Alteration / Remodel (Residential) | remodel one existing bath, add one half bath, as well as general repairs, painting, etc | Gaston County | $34,000 |
| Mar 2, 2026 | HVAC Change Out - Gas | gas package unit. LP | Gaston County | — |
| Sep 12, 2025 | HVAC Changeout - Commercial Structure | changing out package heat pump on ground level | Gaston County | $9,506 |
| Sep 11, 2025 | HVAC Change Out - Electrical | changing out heat pump package unit | Gaston County | — |
| Jun 23, 2025 | HVAC Change Out - Gas | Existing gas package unit change out | Gaston County | — |
| Apr 27, 2025 | Single Trade (Residential) - Electrical | BLDR-24-11-13-16092 eter box inspection and final electrical inspection | Gaston County | — |
| Nov 17, 2022 | ELECTRICAL COMMERCIAL | AT & T Generator | Harnett County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed6
- Issued3
- Finaled2
- Cancelled2
- Active1
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.