Contractor · Electrical
SONOMA COUNTY ELECTRIC LLC
15 building permits since 2026 in Santa Rosa city, CA; Sonoma County, CA and Petaluma city, CA — $600 in reported job value over 1 permits that state one.
- Building permits
- 15
- Reported job value
- $600
- Active
- 2026
- Latest permit
- Mar 24, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Rosa city, CA12
- Sonoma County, CA2
- Petaluma city, CA1
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical15
- Gas11
- Solar5
- Electric meters2
Permit types
As the building departments classify them.
- Electrical14
- Residential Electric Service New/Change and/or Subpanel Replacement/New1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Mar 24, 2026 | Electrical | 100a main panel replacement(zinsco)- like for like, gas nearby. No added loads, no location change. | Santa Rosa City | — |
| Mar 23, 2026 | Residential Electric Service New/Change and/or Subpanel Replacement/New | 100A Main Panel Replacement (ZINSCO)- like for like, gas nearby. No added loads, no location change. | Petaluma City | $600 |
| Mar 14, 2026 | Electrical | Replace and relocate the 100 amp zinsco sub panel from the entryway closet to the interior bedroom wall with new eaton 100 amp sub panel. | Santa Rosa City | — |
| Mar 10, 2026 | Electrical | 100a zinsco main panel upgrade- upgrade to 200a eaton. No gas nearby, no added loads, no location change. | Santa Rosa City | — |
| Mar 10, 2026 | Electrical | 100a main panel replacement(zinsco)- like for like. No gas nearby, no added loads, no location change. | Sonoma County | — |
| Feb 24, 2026 | Electrical | 125a main panel replacement (zinsco)- like for like, gas nearby. No added loads, no location change. | Santa Rosa City | — |
| Feb 17, 2026 | Electrical | 100a main panel replacement (zinsco)- like for like, gas nearby. No added loads, no solar, no location change. | Santa Rosa City | — |
| Feb 10, 2026 | Electrical | 200a main panel upgrade- 100a zinsco for 200a eaton. No gas nearby, no added loads, no location change. | Santa Rosa City | — |
Permit status
Where its permits stand, as the departments report them.
- Finaled13
- Active2
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.