Contractor · Specialty (solar, fire, telecom)

SOLARFUZE ENERGY

15 building permits since 2017 in San Diego County, CA; Riverside city, CA and San Diego city, CA, across 2 counties — $19,800 in reported job value over 1 permits that state one.

Building permits
15
Reported job value
$19.8K
Active
2017–2026
Latest permit
Jan 30, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • San Diego County, CA13
  • Riverside city, CA1
  • San Diego city, CA1

Permits by year

By issue date (application date where there is none).

048
8
2017202120232026*
* 2026 is year to date.
View as table
YearPermits
20171
20215
20238
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Solar13
  • Electrical2
  • Roofing1

Permit types

As the building departments classify them.

  • BRES1
  • Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 30, 2026Electrical—San Diego City—
Aug 11, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
Jul 26, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING PERMITTED STRUCTURES (No Meter Upgrade). This Permit does not exempt any existing structures frSan Diego County—
May 4, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
May 1, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Apr 24, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Apr 24, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—
Apr 24, 2023—HRA (Online Permit) ROOF MOUNT RESIDENTIAL SOLAR PV FOR EXISTING SFD (No Meter Upgrade). This Permit does not exempt any existing structures from compliance witSan Diego County—

Permit status

Where its permits stand, as the departments report them.

  • Issued9
  • Completed3
  • Finaled2
  • Active1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.