Contractor · Specialty (solar, fire, telecom)
SOLAR ENERGY SOLUTIONS OF AMERICA INC
218 building permits since 2019 in Charlotte County, FL; Collier County, FL and Punta Gorda city, FL, across 7 counties — $4,445,392 in reported job value over 211 permits that state one.
- Building permits
- 218
- Reported job value
- $4.4M
- Active
- 2019–2026
- Latest permit
- Oct 7, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Charlotte County, FL97
- Collier County, FL77
- Punta Gorda city, FL26
- North Port city, FL8
- Venice city, FL3
- DeSoto County, FL2
- Hendry County, FL2
- Lee County, FL2
- Hollywood city, FL1
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2019 | 9 |
| 2020 | 28 |
| 2021 | 35 |
| 2022 | 37 |
| 2023 | 37 |
| 2024 | 27 |
| 2025 | 30 |
| 2026 (YTD) | 15 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar210
- Pools & hot tubs65
- Remodels22
- Roofing22
- Additions18
- Electrical6
- Battery storage5
- Plumbing4
- Water heaters4
- New construction4
Permit types
As the building departments classify them.
- Solar74
- Residential Pool Solar System53
- Residential Solar Photovoltaic40
- SOLAR16
- Residential Solar8
- PHOTO VOLTAIC7
- Residential Solar Water Heater4
- NON-CATEGORY3
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 7, 2026 | Residential Solar Photovoltaic | INSTALLATION OF A PHOTOVOLTAIC SOLAR SYSTEM | Charlotte County | $37,596 |
| Sep 11, 2026 | Residential Pool Solar System | INSTALLATION OF A POOL SOLAR SYSTEM | Charlotte County | $4,175 |
| Sep 11, 2026 | Residential Solar Water Heater | INSTALLATION OF A POOL SOLAR SYSTEM | Charlotte County | $4,175 |
| Aug 14, 2026 | RESIDENTIAL | INSTALLATION OF A 11.44 KW PHOTOVOLTAIC SOLAR SYSTEM ECOFLOW OCEAN PRO (26)HIN-T440NF(BK) SUNMODO SMR100 11,440W DC ; 11,500W AC COMPOSITION SHINGLE 21 TO 27 DE | Venice City | — |
| Aug 12, 2026 | Solar | Alteration/Remodel / 1 to 2 Family | Collier County | $3,757 |
| Jul 28, 2026 | Solar | Addition / 1 to 2 Family | Collier County | $42,952 |
| Jul 27, 2026 | Residential Solar | INSTALLATION OF A PHOTOVOLTAIC SOLAR SYSTEM | North Port City | $35,200 |
| Jun 23, 2026 | Electrical | Alteration/Remodel / 1 to 2 Family | Collier County | $21,500 |
Permit status
Where its permits stand, as the departments report them.
- Closed127
- Issued40
- Finaled21
- Completed14
- Active10
- Cancelled4
- Void1
- Expired1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- SOLAR ENERGY SOLUTIONS OF AMERICA
- SOLAR ENERGY SOLUTIONS OF AMER
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.