Contractor · Windows, doors & glazing
richard t conway
15 building permits since 2023 in Falmouth town, MA and Sandwich town, MA.
- Building permits
- 15
- Reported job value
- —
- Active
- 2023–2026
- Latest permit
- Sep 29, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Falmouth town, MA10
- Sandwich town, MA5
Permits by year
By issue date (application date where there is none).
036
6
2023202420252026*
View as tableHide table
| Year | Permits |
|---|---|
| 2023 | 4 |
| 2024 | 1 |
| 2025 | 4 |
| 2026 (YTD) | 6 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Windows & doors7
- Solar3
- Bathrooms2
- Kitchens1
- Remodels1
- Roofing1
- Additions1
- Demolition1
- New construction1
Permit types
As the building departments classify them.
- RESI.8
- REP6
- COMM.1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 29, 2026 | RESI. | — | Sandwich Town | — |
| Sep 14, 2026 | RESI. | all work to be done is on the first floor and some structural in the basement level. remodel first floor kitchen/family room. open up existing kitchen wall to e | Falmouth Town | — |
| Jun 2, 2026 | RESI. | — | Sandwich Town | — |
| Apr 27, 2026 | RESI. | — | Sandwich Town | — |
| Apr 8, 2026 | REP | remove and replace 7 existing windows on the first floor. the exterior of the windows will be trimmed out using azek p.v.c trim boards. no header changes or any | Falmouth Town | — |
| Mar 3, 2026 | COMM. | — | Sandwich Town | — |
| Dec 15, 2025 | REP | replace six windows on second floor with new construction windows, no header changes. fix two rotted cheek walls that the white cedar is rotted by installing p. | Falmouth Town | — |
| Oct 16, 2025 | RESI. | completely new deck. window with header changes on garage. entry door from deck no header change. siding replaced. new steel beam . rubber membrane and new half | Falmouth Town | — |
Permit status
Where its permits stand, as the departments report them.
- Closed9
- Issued3
- Additional information required2
- Withdrawn1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.