Contractor · Electrical

RAY ROHRBOUGH

15 building permits since 1999 in Santa Cruz County, CA.

Building permits
15
Reported job value
—
Active
1999–2006
Latest permit
Jul 31, 2006

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Santa Cruz County, CA15

Permits by year

By issue date (application date where there is none).

01.53
3
1999200220042006
View as table
YearPermits
19991
20002
20022
20031
20043
20053
20063

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical14
  • New construction1

Permit types

As the building departments classify them.

  • Building15

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jul 31, 2006BuildingELECTRIC: Install pump-up system for septic system at an existing SFD.Santa Cruz County—
Jul 24, 2006BuildingInstall electric pump-up system for septic system at an existing SFD.Santa Cruz County—
Apr 27, 2006BuildingInstall electrical control panel for septic system at an existing SFD.Santa Cruz County—
Dec 27, 2005BuildingEL: Electrical permit to run a branch circut to supply a new septic pump system at an existing SFD.Santa Cruz County—
Jun 16, 2005BuildingInstall electric pump-up system for septic system at new SFD.Santa Cruz County—
May 17, 2005BuildingInstall electric pump-up system for septic system at an existing SFD.Santa Cruz County—
Sep 14, 2004BuildingEL: Permit to install a new branch circut to supply a septic pump system at an existing SFD.Santa Cruz County—
Jul 14, 2004BuildingInstall electrical for septic pump system at an existing SFD.Santa Cruz County—

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.