Contractor · General building
Raymond Armant
15 building permits since 2015 in Orleans Parish, LA and East Baton Rouge Parish, LA, across 2 counties — $5,150,000 in reported job value over 2 permits that state one.
- Building permits
- 15
- Reported job value
- $5.2M
- Active
- 2015–2026
- Latest permit
- Sep 18, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Orleans Parish, LA13
- East Baton Rouge Parish, LA2
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2015 | 2 |
| 2016 | 1 |
| 2017 | 4 |
| 2021 | 1 |
| 2022 | 1 |
| 2023 | 2 |
| 2024 | 2 |
| 2025 | 1 |
| 2026 (YTD) | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Remodels13
- Windows & doors4
- Roofing3
- Bathrooms3
- HVAC2
- Additions2
- Plumbing2
- Demolition2
- Electrical2
- Fire sprinklers2
Permit types
As the building departments classify them.
- Renovation (Non-Structural)3
- Existing Bldg - Remodel Only (C)2
- Renovation (Structural)2
- New Construction1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 18, 2026 | — | The 18th Ward is a non-profit organization serving New Orleans youth. This review is for the purposes of doing an official Change of Occupancy to allow the cont | Orleans Parish | — |
| May 1, 2025 | — | NON-STRUCTURAL INTERIOR RENOVATION TENANT IMPROVEMENT BUILD-OUT FOR A 4148 SF OFFICE TENANT AT 2ND LEVEL OF EXISTING BUILDING. REFER TOPERMIT 22-37791-RNVS FOR | Orleans Parish | — |
| Apr 30, 2024 | New Construction | 4-STORY, 71415 sq ft, NEW CONSTRUCTION DORMITORY, 127 bedrooms, 80 bathrooms, LOCATED IN AN EC EDUCATIONAL CAMPUS DISTRICT, AS A RESIDENCE HALL FACILITY FOR THE | Orleans Parish | — |
| Mar 5, 2024 | Renovation (Non-Structural) | The proposed work is an interior alteration to approx. 2800sf of existing office suite within Xavier's Universities 3 story 55,000 sf Administration Building to | Orleans Parish | — |
| Jul 13, 2023 | Renovation (Structural) | RENOVATION AND MODERNIZATION OF AN EXISTING 29,783 SF HIGH SCHOOL GYMNASIUM WITH 2 NEW MEZZANINE ADDITIONS TOTALING 3,977 SF. THE RENOVATION IS TO INCLUDE MODIF | Orleans Parish | — |
| Feb 24, 2023 | Renovation (Structural) | STRUCTURAL REPAIR TO EXISTING FIRE DAMAGED ROOF FRAMING & SPALLED CONCRETE STRUCTURE AND REPLACEMENT OF THE EXISTING ROOF DECKING AND ROOFING OVER A 11,310 SF E | Orleans Parish | — |
| Mar 23, 2022 | Renovation (Non-Structural) | The renovation includes improvements to the historic Main campus building and grounds consisting of classroom and lab modernization, new finishes, introduction | Orleans Parish | — |
| Sep 14, 2021 | Renovation (Non-Structural) | THIS RENOVATION PROJECT CURRENTLY ONLY INCLUDES REPLACEMENT OF THE EXISTING LOW SLOPE ROOFING AS WELL AS REPLACEMENT OF ALL EXTERIOR WINDOWS LOCATED AT THE ORIG | Orleans Parish | — |
Permit status
Where its permits stand, as the departments report them.
- C/o issued5
- Finaled4
- Issued3
- Not stated2
- Expired1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.