Contractor · Electrical
PHIL HAUPT ELECTRIC INC
15 building permits since 2016 in Sacramento city, CA — $125,080 in reported job value over 15 permits that state one.
- Building permits
- 15
- Reported job value
- $125.1K
- Active
- 2016–2017
- Latest permit
- Apr 20, 2017
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA15
Permits by year
By issue date (application date where there is none).
07.515
12
20162017
View as tableHide table
| Year | Permits |
|---|---|
| 2016 | 12 |
| 2017 | 3 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical12
- EV chargers9
Permit types
As the building departments classify them.
- Single Family7
- Private Garage5
- Condos1
- Hotel or Motel1
- Industrial1
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Apr 20, 2017 | Single Family | Install a Tesla EV Charging station, set to 60Amps, within the garage. Power to be supplied by a 60A breaker, located within existing 125A Sub Panel and (2) #6 | Sacramento | $825 |
| Mar 14, 2017 | Single Family | Install (N) 100A circuit breaker & protected wiring supplying new EV Charging Station in the Garage. Carbon monoxide & Smoke alarms required. Reference CRC sect | Sacramento | $1,600 |
| Feb 10, 2017 | Single Family | Install 50amp 240V NEMA 14-50R Outlet, 50amp breaker, conduit encased conductors from existing main service panel to garage, for EV charging purposes. | Sacramento | $470 |
| Dec 13, 2016 | Single Family | Install NEMA 14-50 outlet in the garage, Carbon monoxide & Smoke alarms required. Reference CRC sections R315 & R314 | Sacramento | $1,500 |
| Oct 5, 2016 | Private Garage | Install Tesla High Power Wall Connector Charging Station w/ new 50A main breaker circuit. | Sacramento | $395 |
| Sep 29, 2016 | Condos | Install Electric Vehicle Charger Receptacle, NEMA 14-50, in garage , supplied by new 50A circuit breaker | Sacramento | $475 |
| Sep 29, 2016 | Single Family | In Garage, adding 1 GFCI outlets (120V) on a 20A circuit. | Sacramento | $335 |
| Aug 31, 2016 | Private Garage | Install electric vehicle charging station in the garage | Sacramento | $395 |
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.