Contractor · Specialty (solar, fire, telecom)
SOLAR SAVINGS DIRECT INC
220 building permits since 2000 in Sacramento city, CA; Davis city, CA and Marin County, CA, across 21 counties — $3,713,729 in reported job value over 195 permits that state one.
- Building permits
- 220
- Reported job value
- $3.7M
- Active
- 2000–2026
- Latest permit
- Jul 13, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Sacramento city, CA63
- Davis city, CA34
- Marin County, CA15
- Elk Grove city, CA14
- Tuolumne County, CA13
- Citrus Heights city, CA13
- Amador County, CA9
- Sacramento County, CA9
- Mountain View city, CA9
- Kings County, CA5
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2000 | 1 |
| 2018 | 3 |
| 2019 | 3 |
| 2020 | 4 |
| 2021 | 5 |
| 2022 | 33 |
| 2023 | 41 |
| 2024 | 47 |
| 2025 | 32 |
| 2026 (YTD) | 49 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar158
- Electrical95
- Plumbing54
- Battery storage52
- Water heaters49
- Roofing14
- HVAC6
- New construction3
- EV chargers2
- Windows & doors2
Permit types
As the building departments classify them.
- Single Family55
- PHOTOVALTIC RESIDENTIAL31
- Electrical24
- RESIDENTIAL15
- ELECTRICAL9
- ROOF MOUNT SOLAR7
- BL, CH, EL5
- ONLINE SOLAR PHOTOVOLTAIC PERMITS5
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Jul 13, 2026 | Single Family | 8.2kw Solar PV System, 54 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). | Sacramento | $54,284 |
| Jul 10, 2026 | Half Plex | 0kw Solar PV System, 27 kw PV Storage System Size and 0gal Solar WH System (water heater installed null). | Sacramento | $10,000 |
| Jun 25, 2026 | SolarApp | SolarApp ID: SA20260625-2133-256-1677-A; Installation of a 7.92kw dc system, 18 modules roof mounted, with 1 tesla battery and 1 tesla expansion. | Sacramento County | $30,231 |
| Jun 24, 2026 | SolarApp | SolarApp ID: SA20260624-2133-250-1677-A; Installation of a 8.2kw dc system, 20 modules roof mounted, with 1 tesla battery and 1 tesla expansion. | Sacramento County | $43,878 |
| Jun 22, 2026 | Reroof | Reroof | Citrus Heights City | $15,000 |
| Jun 19, 2026 | Single Family | Reviewed by SolarApp+ 4.1kw Solar PV System, 23 kw PV Storage System Size and nullgal Solar WH System (water heater installed null). | Sacramento | $35,350 |
| Jun 16, 2026 | Single Family | E-Permit: existing panel 225 Amps - Underground service, new main panel 225 Amps, N/A weather head/masthead work. | Sacramento | $5,000 |
| Jun 10, 2026 | PANR | Electrical service panel replacement or emergency repair only. No additional electrical, mechanical, plumbing, or structural work permitted.; Electrical service | Sacramento County | $3,000 |
Permit status
Where its permits stand, as the departments report them.
- Issued83
- Not stated54
- Completed32
- Finaled23
- Closed13
- Active11
- Expired1
- Cancelled1
Also on file as
Spellings on its permits, combined into this profile because they work the same area:
- SOLAR SAVINGS DIRECT
- SOLAR SAVING DIRECT
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.