Contractor · Specialty (solar, fire, telecom)
HALIL ASLAN
220 building permits since 2012 in Waltham city, MA; Boston city, MA and Grafton town, MA, across 15 counties — $5,447,698 in reported job value over 173 permits that state one.
- Building permits
- 220
- Reported job value
- $5.4M
- Active
- 2012–2026
- Latest permit
- Sep 22, 2026
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Waltham city, MA24
- Boston city, MA14
- Grafton town, MA13
- Andover town, MA12
- Lexington town, MA8
- Plymouth town, MA7
- Westford town, MA6
- Worcester city, MA6
- Somerville city, MA5
- Attleboro city, MA4
Permits by year
By issue date (application date where there is none).
View as tableHide table
| Year | Permits |
|---|---|
| 2012 | 1 |
| 2013 | 2 |
| 2015 | 5 |
| 2016 | 1 |
| 2017 | 1 |
| 2018 | 3 |
| 2019 | 20 |
| 2020 | 7 |
| 2021 | 6 |
| 2022 | 16 |
| 2023 | 77 |
| 2024 | 34 |
| 2025 | 42 |
| 2026 (YTD) | 4 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Solar166
- Battery storage73
- Electrical22
- Roofing16
- Remodels5
- HVAC4
- Pools & hot tubs4
- Heat pumps2
- Additions1
- Windows & doors1
Permit types
As the building departments classify them.
- Building Permit42
- Solar Permit24
- RESI.22
- Solar Panels Residential22
- SOL12
- Building Permit Application8
- Building Permit - Short Form7
- Building Permit - Residential6
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Sep 22, 2026 | Building Permit | Removal of rooftop solar panels and reinstallation at a later date after roof replacement. No change in the array layout or structural loads | Andover Town | $15,750 |
| Sep 15, 2026 | Residential Building Permit | Outdoor BATTERY ONLY installation. NO SOLAR PANELS Total combined battery capacity 30 kWh UNIT TO BE INSTALLED ON 3/4" FIRE RATED PLYWOOD FOR WALL AND SOFIT PRO | Medfield Town | $26,489 |
| Apr 1, 2026 | Building Permit Application | Relocation of old solar panels from the west-facing roof to the newly constructed addition on the same property. Only rooftop solar panels will be relocated | Winchester Town | $4,000 |
| Mar 27, 2026 | Building Permit Application: Commerical | Chocolate Retail Kiosk,No seating , no cooking, retail chocolate sales | Peabody City | $21,000 |
| Dec 1, 2025 | RESI. | — | Concord Town | — |
| Nov 4, 2025 | Building Permit | Solar installation of 8.8 kW DC system with 20 solar panels and microinverters. (No ESS / Battery) | Grafton Town | $26,158 |
| Oct 28, 2025 | Building Permit Application | Solar installation of 9.6 kW DC system with 22 solar panels and microinverters. (No ESS / Battery) | Quincy City | $29,463 |
| Oct 27, 2025 | Building Permit | Solar installation of 6.15 kW DC system with 15 solar panels and microinverters. (No ESS / Battery) | Grafton Town | $19,926 |
Permit status
Where its permits stand, as the departments report them.
- Completed101
- Active49
- Not stated26
- Closed21
- Issued14
- Finaled6
- Stop work ordered3
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.