Contractor · Electrical
MARTIN JEANELL TRUSTEE
15 building permits since 2002 in Santa Cruz County, CA.
- Building permits
- 15
- Reported job value
- —
- Active
- 2002–2022
- Latest permit
- Oct 18, 2022
Where it works
Counties shaded by permits filed there; the dashed outline encloses every permit location.
Busiest jurisdictions
- Santa Cruz County, CA15
Permits by year
By issue date (application date where there is none).
01.53
3
20022010201420182022
View as tableHide table
| Year | Permits |
|---|---|
| 2002 | 2 |
| 2003 | 1 |
| 2010 | 1 |
| 2013 | 2 |
| 2014 | 3 |
| 2016 | 1 |
| 2018 | 2 |
| 2019 | 2 |
| 2022 | 1 |
Type of work
Permits describing each kind of work; one permit can cover several.
- Electrical7
- Solar5
- Kitchens3
- Roofing3
- Windows & doors3
- HVAC2
- Remodels2
- Bathrooms2
- Plumbing2
- Grading & excavation1
Permit types
As the building departments classify them.
- Building15
Recent permits
The 8 newest on file.
| Date | Type | Work | Jurisdiction | Job value |
|---|---|---|---|---|
| Oct 18, 2022 | Building | Cable rail fence 42" high, 61' 4-1/2" linear feet. Coastal development permit #201398. | Santa Cruz County | — |
| Jul 17, 2019 | Building | Remodel the existing kitchen to include new cabinets, counter tops, fixtures, appliances, lighting, finishes and sections of decayed flooring, permit to include | Santa Cruz County | — |
| Jan 3, 2019 | Building | See BP B-173978 for Emergency Grading Permit APN's 038-151-12, -58 & -60 Recognize as-built 660 square foot stitch pier & grade beam below ground retaining wall | Santa Cruz County | — |
| Mar 14, 2018 | Building | Electrical Permit to include refeeding existing circuit to outlets, replace outlets as required, remove stove circuit and minor repairs as required. Permit to i | Santa Cruz County | — |
| Feb 20, 2018 | Building | Remove and replace the sewer ejector pump at an existing SFD. Install listed smoke detectors and carbon monoxide alarms or combination smoke and carbon monoxide | Santa Cruz County | — |
| Dec 21, 2016 | Building | LRA, APTOS Fire Replace electric service panel with new 125A service panel at an existing single family dwelling. Install listed smoke detectors and carbon mono | Santa Cruz County | — |
| Apr 3, 2014 | Building | Change Order to B-141428 (roof-mount PV system) to revise electrical diagram (page E1.0) from load center to AC disconnect. | Santa Cruz County | — |
| Feb 27, 2014 | Building | EL: Install photovoltaic electrical system not to exceed 32 feet in height on a single family dwelling. The Building Inspector may require roof structural plans | Santa Cruz County | — |
Permit status
Where its permits stand, as the departments report them.
- Completed14
- Not stated1
Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.