Contractor · Electrical

KERR ELECTRIC SERVICE

15 building permits since 2019 in Marin County, CA and Sonoma County, CA, across 2 counties — $26,000 in reported job value over 14 permits that state one.

Building permits
15
Reported job value
$26K
Active
2019–2026
Latest permit
Jan 5, 2026

Where it works

Counties shaded by permits filed there; the dashed outline encloses every permit location.

Permits by county, fewer to moreOperating area

Busiest jurisdictions

  • Marin County, CA14
  • Sonoma County, CA1

Permits by year

By issue date (application date where there is none).

024
4
2020202220242026*
* 2026 is year to date.
View as table
YearPermits
20191
20201
20214
20224
20232
20241
20251
2026 (YTD)1

Type of work

Permits describing each kind of work; one permit can cover several.

  • Electrical15
  • Electric meters13
  • Gas1

Permit types

As the building departments classify them.

  • RESIDENTIAL14
  • Electrical1

Recent permits

The 8 newest on file.

DateTypeWorkJurisdictionJob value
Jan 5, 2026ElectricalWe are remove and replace a 100 amp federal pacific meter main with distribution, with a code compliant meter main in the same location underground service. TheSonoma County—
Jan 8, 2025RESIDENTIALreplace existing 100 amp service with a new 200 amp meter main with distribution in the same location overhead serviceMarin County$2,000
Jan 12, 2024RESIDENTIALreplace existing 100 amp meter main, with a new code compliant meter main with distribution in the same location overhead service.Marin County$2,000
Oct 18, 2023RESIDENTIALreplace all the Zinsco breakers, and install a new load center with new Code compliant breakers, grounding, and bonding, just behind the Zinsco meter mainMarin County$1,500
Aug 2, 2023RESIDENTIALreplace old Meter main with a new 200 amp meter main with distribution in a new location on the garage.Marin County$2,000
Oct 24, 2022RESIDENTIALReplace an existing Zinsco 125 amp Load center, with a new code compliant load center in the same location.Marin County$1,000
Aug 15, 2022RESIDENTIALreplace outdated 100 amp meter main with a new 200 amp Meter main with distribution, relocated to the right side of Garage.Marin County$2,500
Aug 1, 2022RESIDENTIALreplace existing Zinsco 100 amp Meter main with a new 125 amp meter main with distribution in the same location underground service.Marin County$2,000

Permit status

Where its permits stand, as the departments report them.

  • Not stated14
  • Finaled1

Compiled from public building permit records. A contractor here is the name on the permits, with spelling variants combined where they work the same area; the same name in distant markets is listed separately. Job values are as reported on the permits.